• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-02-24 09:51来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 **ON A/C ALL
 FOR 21HM 
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
 122VU AIR COND/PACK TEMP/CTL SYS1/2/115VAC 122VU AIR COND/PACK TEMP/CTL SYS1/2/28VDC 122VU AIR COND/PACK TEMP CTL SYS2/2/28VDC 122VU AIR COND/PACK TEMP CTL SYS2/2/115VAC  21HH 23HH 24HH 22HH  W22W21Y21Y20 
R  **ON A/C 401-499,
R R  122VU AIR COND/TEMP CTL SYS 2/CHAN A/115VAC 122VU AIR COND/TEMP CTL SYS 2/CHAN A/28VDC 122VU AIR COND/TEMP CTL SYS 2/CHAN B/28VDC 122VU AIR COND/TEMP CTL SYS 2/CHAN B/115VAC  53HH 55HH 56HH 54HH  W22W21 Y21Y20 

 

 **ON A/C ALL
 Subtask 21-52-00-860-057
 B. Aircraft Maintenance Configuration
 (1) Do the EIS stop procedure (Ref. TASK 31-60-00-860-002). Subtask 21-52-00-862-062
 C. De-energize the aircraft electrical circuits
 (Ref. TASK 24-41-00-862-002).

 1EFF : ALL 1 21-52-00Page 644 1 1 Aug 01/05R 1 1 1CES 1


 TASK 21-52-00-200-013 Detailed Inspection of the Pack Downstream Check-Valve Flappers
 1.
 Reason for the Job

__________________
 Referenced from AMM


 2.
 Job Set-up Information


______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
21-52-43-000-001  Removal of the Pack Downstream Check-Valves 15HM and 16HM 21-52-43-400-001 Installation of the Pack Downstream Check-Valves 15HM and 16HM
 3. Job Set-up
__________ Subtask 21-52-00-010-072
 A. Remove the pack downstream check-valves as necessary (Ref. TASK 21-52-43-000-001).
 4. Procedure
_________ Subtask 21-52-00-210-061
 A. Detailed Inspection of the Pack Downstream Check-Valve Flappers for
 Condition and Operation.

 (1)
 Make sure that the check valve is clean.

 (2)
 Do a detailed visual inspection for signs of cracks, dents, marks or corrosion of:

 -
the valve flap and its seat,

 -
the hinge pin and,

 -
the spring of the valve flap.

 

 (3)
 Move the valve flap with your hand to make sure that it operates smoothly on its hinge pin.


 1EFF : ALL 1 21-52-00Page 645 1 1 Aug 01/05R 1 1 1CES 1


 (4)
 Make sure that:

 -the valve flap touches its seat correctly and,
 -there are no gaps between the valve flap and the seat.

 (5)
 If necessary replace the pack downstream check-valve.


 5. Close-up
________ Subtask 21-52-00-410-070
 A. Install the pack downstream check-valves as necessary (Ref. TASK 21-52-43-400-001).
 1EFF : ALL 1 21-52-00Page 646 1 1 Aug 01/05R 1 1 1CES 1


 AIR COOLING SYSTEM - CLEANING/PAINTING
______________________________________
 TASK 21-52-00-100-001
 Cleaning of the Air Conditioning Pack-Primary Heat Exchanger 10HM6 (11HM6) and the Main Heat Exchanger 10HM7 (11HM7)
 WARNING : MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM
_______
 FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
 HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.

 1. Reason for the Job
__________________
 Refer to the MPD TASK: 215200-01
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE  QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific  circuit breaker(s) safety clip(s)
 B. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
21-52-25-000-001 Removal of the Primary Heat Exchanger 10HM6 (11HM6) 21-52-25-400-001 Installation of the Primary Heat Exchanger 10HM6
 (11HM6) 21-52-26-000-001 Removal of the Main Heat Exchanger 10HM7 (11HM7) 21-52-26-400-001 Installation of the Main Heat Exchanger 10HM7 (11HM7) 24-41-00-861-002 Energize the Aircraft Electrical Circuits from the
 External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power 53-35-13-000-002 Removal of the Quick-Release Access Panels from the Belly Fairing Structure 53-35-13-400-002 Installation of the Quick-Release Access Panels on
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 4(17)