• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-02-24 09:51来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

**ON A/C ALL
 Subtask 21-52-00-010-065
 C. Get Access
 (1) Remove the access panel/s (Ref. TASK 53-35-13-000-002).
 (a) FOR 10HM2 - 191BB and 191KB.
 (b) FOR 11HM2 - 192FB and 192KB.
 (2) Remove the condenser (Ref. TASK 21-52-32-000-001).
 4. Procedure_________
 Subtask 21-52-00-790-050
 A. Leak Test
 (1) Do the leakage test of the condenser (Ref. CMM 215210).

 

 5. Close-up
________
 Subtask 21-52-00-410-063

 A. Close Access
 (1)
 Install the condenser (Ref. TASK 21-52-32-400-001).

 (2)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (3)
 Install the access panel/s (Ref. TASK 53-35-13-400-002).

 (a)
 FOR 10HM2

 -191BB and 191KB.

 (b)
 FOR 11HM2

 


 -192FB and 192KB. R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
 Subtask 21-52-00-865-064
 B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
 FOR 10HM2
 1HH, 2HH, 3HH, 4HH.

 FOR 11HM2
 21HH, 22HH, 23HH, 24HH.


R **ON A/C 401-499,
 Subtask 21-52-00-865-064-A
 B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
 FOR 10HM2
 49HH, 50HH, 51HH, 52HH.

 FOR 11HM2
 53HH, 54HH, 55HH, 56HH.

 

 **ON A/C ALL Subtask 21-52-00-862-056
 C. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).


 AIR COOLING SYSTEM - INSPECTION/CHECK
_____________________________________
 TASK 21-52-00-200-001
R Detailed Inspection of Interior and Exterior of Plenum Chamber (10HM5 and R 11HM5) for Signs of Delamination
 WARNING : MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM
_______
 FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
 HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.

 NOTE : This procedure is not applicable to air cycle machine-plenum chamber P/N
____
 1816A0000-01.

 1. Reason for the Job
__________________
 Refer to the MPD TASK: 215222-01
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
 B. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
21-52-22-000-001 Removal of the Fan Plenum Chamber 10HM5 (11HM5). 21-52-22-400-001 Installation of the Fan Plenum Chamber 10HM5 (11HM5) 21-52-24-000-001 Removal of the Heat Exchanger Unit 10HM4 (11HM4)
 (From the Aircraft) 21-52-24-400-001 Installation of the Heat Exchanger Unit 10HM4 (11HM4) (Into the Aircraft) 24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power 53-35-13-000-002 Removal of the Quick-Release Access Panels from the Belly Fairing Structure


 -------------------------------------------------------------------------------
REFERENCE DESIGNATION -------------------------------------------------------------------------------
53-35-13-400-002 Installation of the Quick-Release Access Panels on the Belly Fairing Structure **ON A/C 001-049, 051-099, 101-149, 201-299, 301-399,
R  21-52-00-991-001 Fig. 601 **ON A/C 151-199, 401-499,
 21-52-00-991-001-A **ON A/C ALL Fig. 601A
 3. Job Set-up__________ Subtask 21-52-00-861-052
 A. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002). Subtask 21-52-00-865-052
 B. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------FOR 10HM5 
R  **ON A/C 401-499,
R  49VU AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399, 52HH  D08 
R  122VU AIR COND/PACK TEMP/CTL SYS1/1/115VAC 122VU AIR COND/PACK TEMP/CTL SYS1/1/28VDC  1HH 3HH  X22X21 

 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 4(7)