R B. Consumable Materials
R -------------------------------------------------------------------------------R REFERENCE DESIGNATION
R -------------------------------------------------------------------------------
R Material No. 06-007 USA SS-G-659
R GRAPHITE POWDER DRY LUBRICANT (Ref. 20-31-00)
R C. Referenced Information
R -------------------------------------------------------------------------------R REFERENCE DESIGNATION
R -------------------------------------------------------------------------------
R 12-33-21-618-001 R 12-33-21-618-001 R 24-41-00-861-002 R R 24-41-00-862-002 R R 53-35-13-000-002 R Pre-conditioning through the HP Ground Connection Pre-conditioning with the APU Energize the Aircraft Electrical Circuits from the External Power De-energize the Aircraft Electrical Circuits Supplied from the External Power Removal of the Quick-Release Access Panels from the Belly Fairing Structure
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
R 53-35-13-400-002 Installation of the Quick-Release Access Panels on
R the Belly Fairing Structure
R CMM 215202
R 21-52-00-991-016 Fig. 803
R 3. Job Set-up__________
R Subtask 21-52-00-861-058
R A. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).
R Subtask 21-52-00-865-065
R B. Open, safety and tag this(these) circuit breaker(s):
R -------------------------------------------------------------------------------
R PANEL DESIGNATION IDENT. LOCATION
R -------------------------------------------------------------------------------
R FOR 10HM1
R 122VU AIR COND/PACK TEMP/CTL SYS1/1/115VAC 1HH X22
R 122VU AIR COND/PACK TEMP/CTL SYS1/1/28VDC 3HH X21
R 122VU AIR COND/PACK TEMP CTL SYS2/1/28VDC 4HH Y19
R 122VU AIR COND/PACK TEMP CTL SYS2/1/115VAC 2HH Y18
R FOR 11HM1
R 122VU AIR COND/PACK TEMP/CTL SYS1/2/115VAC 21HH W22
R 122VU AIR COND/PACK TEMP/CTL SYS1/2/28VDC 23HH W21
R 122VU AIR COND/PACK TEMP CTL SYS2/2/28VDC 24HH Y21
R 122VU AIR COND/PACK TEMP CTL SYS2/2/115VAC 22HH Y20
R Subtask 21-52-00-860-055
R C. Aircraft Maintenance Configuration
R (1) On the panel 30VU:
R (a) Make sure that:
R - the APU BLEED pushbutton switch is in the off position (the ON
R legend is off) and,
R - the ENG 1 BLEED and the ENG 2 BLEED pushbutton switches are in
R the off position (the OFF legends are on).
R (b) Put a warning notice in position to tell persons not to operate
R these pushbutton switches.
R (2) On the HP ground connector put a warning notice in position to tell
R persons not to supply the ground air.
R Subtask 21-52-00-010-066
R D. Get Access
R (1) Remove the access panel (Ref. TASK 53-35-13-000-002).
R FOR 10HM1
R 191KB,
R FOR 11HM1
R 192KB.
R (2) Removal of the Compressor Return Duct
R (a) Remove the screws (3), the washers (2) and the yoke (1).
R (b) Remove the nuts (12), the bolts (8), the spacers (5) and the
R yokes (7) together with the shims (6).
R (c) Remove the screws (9), the washers (10) and the compressor return
R duct (4).
R 4. Procedure_________
R (Ref. Fig. 803/TASK 21-52-00-991-016)
R Subtask 21-52-00-360-050
R A. Replacement of the Preformed Packings
R (1) Remove the preformed packings (11) and (13) from the compressor
R return duct (4).
R (2) Clean the preformed packings location grooves on the compressor
R return duct (4).
R (3) Apply lubricant:
R CAUTION : USE ONLY THE SPECIFIED LUBRICANT TO LUBRICATE THE O-RINGS_______
R AND THE PACKINGS. OTHER LUBRICANTS CAN CAUSE SMOKE OR A
R SMELL IN THE CABIN WHEN THEY BECOME HOT.
R (a) Apply a small quantity of LUBRICANTS (Material No. 06-007) to the
R new preformed packings (11) and (13) (Ref. CMM 215202).
R Air Cycle Machine - Compressor Return Duct R Figure 803/TASK 21-52-00-991-016 中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 4(27)