The APU bleed-air duct with its sleeves and clamps (1).

 -
The crossfeed duct with its sleeves and clamps (2).

 -
The ozone filter (7).

 -
The flow control valve (3).

 -
The duct between the flow control valve and the primary heat exchanger (4).

 -
The duct between the primaray heat exchanger and the compressor of the air cycle machine (5).

 -
The compressor of the air cycle machine and the main heat exchanger (6).

 


 NOTE : There is a higher risk of leaks at the clamps and seals at the
____ duct connections than at the ducts itselves.
 (3)
 Repair all leaks.

 (4)
 Stop the pre-conditioning (Ref. TASK 12-33-21-618-001) or (Ref. TASK 12-33-21-618-001).


R 1EFF : ALL 1 21-52-00Page 625 1 1 Aug 01/05 1 1 1CES 1


 Air Conditioning Bay - Component Location
 Figure 604/TASK 21-52-00-991-017

R 1EFF : 001-049, 101-105, 151-199, 1 21-52-00Page 626 1 1 Aug 01/05 1 1 1CES 1

 

R **ON A/C 051-099, 106-149, 201-299, 301-399,

 Subtask 21-52-00-790-051
 A. Hot-Air Leak-Check
 (Ref. Fig. 604A/TASK 21-52-00-991-017-A)

 WARNING : PUT ON PROTECTIVE GOGGLES AND THERMAL GLOVES WHEN YOU GO NEAR
_______ AN AIR-CONDITIONING PACK WHEN IT OPERATES. THERE CAN BE LEAKAGE OF HOT AIR, WHICH CAN CAUSE INJURIES.
 (1)
 Do the pre-conditioning through the HP ground connector (Ref. TASK 12-33-21-618-001) or with the APU (Ref. TASK 12-33-21-618-001).

 (2)
 Do a Check for Hot-Air Leaks Do this check on all the hot components which are in the air conditioning bay:

 -
The APU bleed-air duct with its sleeves and clamps (1).

 -
The crossfeed duct with its sleeves and clamps (2).

 -
The flow control valve (3).

 -
The duct between the flow control valve and the primary heat exchanger (4).

 -
The duct between the primary heat exchanger and the compressor of the air cycle machine (5).

 -
The compressor of the air cycle machine and the main heat exchanger (6).

 


 NOTE : There is a higher risk of leaks at the clamps and seals at the
____ duct connections than at the ducts itselves.
 (3)
 Repair all leaks.

 (4)
 Stop the pre-conditioning (Ref. TASK 12-33-21-618-001) or (Ref. TASK 12-33-21-618-001).

 

R **ON A/C 401-499,
 Subtask 21-52-00-790-051-B
 A. Hot-Air Leak-Check R (Ref. Fig. 604B/TASK 21-52-00-991-017-C)
 WARNING : PUT ON PROTECTIVE GOGGLES AND THERMAL GLOVES WHEN YOU GO NEAR
_______ AN AIR-CONDITIONING PACK WHEN IT OPERATES. THERE CAN BE LEAKAGE OF HOT AIR, WHICH CAN CAUSE INJURIES.
R 1EFF : 051-099, 106-149, 201-299, 301-399, 1 21-52-00Page 627 1401-499, 1Aug 01/05 1 1 1CES 1


 Air Conditioning Bay - Component Location Figure 604A/TASK 21-52-00-991-017-A
R 1EFF : 051-099, 106-149, 201-299, 301-399, 1 21-52-00Page 628 1 1 Aug 01/05 1 1 1CES 1


R  Air Conditioning Bay - Component Location 
R  Figure 604B/TASK 21-52-00-991-017-C 
R 1EFF :  401-499,  1  21-52-00 Page 629 
1  1  Aug 01/05
 1  1
 1CES  1

 

 (1)
 Do the pre-conditioning through the HP ground connector (Ref. TASK 12-33-21-618-001) or with the APU (Ref. TASK 12-33-21-618-001).

 (2)
 Do a Check for Hot-Air Leaks Do this check on all the hot components which are in the air conditioning bay:

 -
The APU bleed-air duct with its sleeves and clamps (1).

 -
The crossfeed duct with its sleeves and clamps (2).

 -
The flow control unit (3).

 -
The duct between the flow control unit and the primary heat exchanger (4).

 -
The duct between the primary heat exchanger and the compressor of the air cycle machine (5).

 -
The compressor of the air cycle machine and the main heat exchanger (6).

 


 NOTE : There is a higher risk of leaks at the clamps and seals at the
____ duct connections than at the ducts themselves.
 (3)
 Repair all leaks.

 (4)
 Stop the pre-conditioning (Ref. TASK 12-33-21-618-001) or (Ref. TASK 12-33-21-618-001).


 **ON A/C ALL
 5. Close-up
________
 Subtask 21-52-00-410-067
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Install the access panel(s) (Ref. TASK 53-35-13-400-002)
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 4(13)