• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-02-12 09:19来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (a)
 Through the LP ground connector (Ref. TASK 12-33-21-618-001),

 (b)
 Through the HP ground connector (Ref. TASK 12-33-21-618-001) or

 (c)
 With the APU (Ref. TASK 12-33-21-618-001) and (Ref. TASK 12-31-49-660-001).


 5. Close-up
________
 1EFF : ALL 1 12-31-21Page 203 1 1 May 01/99R 1 1 1CES 1


 COLD WEATHER MAINTENANCE - ELECTRICAL POWER - MAINTENANCE PRACTICES
___________________________________________________________________
 TASK 12-31-24-660-001
 Cold Weather Maintenance - Electrical Power

 1. Reason for the Job
__________________
 This procedures gives the cold weather maintenance practices for the batteries when the aircraft is in a cold soak configuration.
 2. Job Set-up Information
______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
R 12-31-24-991-001 Fig. 201
 3. Job Set-up
__________
 Subtask 12-31-24-941-050

 A. Not Applicable
 4. Procedure
_________
 Subtask 12-31-24-660-050

 A. General. In very low temperatures, the chemical reaction of the electrolyte is slower and the performance of the batteries decreases :
 -
the quantity of high current the batteries can supply decreases,

 -
the time necessary to charge the batteries increases. This procedure gives you instructions that keep the batteries serviceable.


 NOTE : The values specified in this procedure are only applicable if the
____ aircraft doors stay closed during the cold soak.


 Subtask 12-31-24-660-051

 B. Battery Cold Weather Maintenance Practices.
R  (1) The batteries can stay on the aircraft during the cold soak if : - the OAT stays higher than -15 deg.C (+5.00 deg.F), 
R R R R  (2) Refer to the graph to know the battery cool-down time. You must remove the batteries before their internal temperature reaches -15 DEG.C (+5.00 DEG.F). (Ref. Fig. 201/TASK 12-31-24-991-001)
 NOTE : We recommend that you use a ground power unit to start the APU____ if the OAT was lower than -15 deg.C (+5.00 deg.F) during the cold soak.

 

R R  Batteries Cooling Down Curve Figure 201/TASK 12-31-24-991-001
 1EFF : 1 1 1CES  ALL  1 111 12-31-24 Page 203 Feb 01/05

 

 COLD WEATHER MAINTENANCE - EQUIPMENT/FURNISHINGS - MAINTENANCE PRACTICES
________________________________________________________________________
 TASK 12-31-25-660-001
 Cold Weather Maintenance - Equipment/Furnishings
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific warning notice
 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 05-027B X (Ref. 20-31-00)
 C. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-31-38-660-001 Cold Weather Maintenance - Water/Waste 12-33-21-618-001 Pre-conditioning through the LP Ground Connection 25-52-22-000-001 Removal of the Ball Mats and Ball Strips 25-52-22-400-001 Installation of the Ball Mats and Ball Strips 52-10-00-010-001 Opening of the Passenger/Crew Door 52-10-00-410-001 Closing of the Passenger/Crew Door 52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the
 Yellow Electric Pump 52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the
 Yellow Electric Pump

 3. Job Set-up
__________

 Subtask 12-31-25-010-050
 A. Get Access
 (1) Open the Cargo Compartment Doors (Ref. TASK 52-30-00-860-001).
 (2) Get Access to the Cabin (Ref. TASK 52-10-00-010-001).
 4. Procedure_________
 Subtask 12-31-25-660-050
 A. Do the Cold Weather Maintenance
 (1) Cargo Compartments - Door Sill Latches
 (a) Remove the ball strips adjacent to the door sill latches (Ref. TASK 25-52-22-000-001).
 (b) Do an inspection of the component interface and/or the adjacent area.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM SERVICING 2(53)