• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-02-12 09:19来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (2)
 Depressurize the Blue hydraulic system (Ref. TASK 29-10-00-864-003).

 (3)
 Depressurize the reservoir of the Blue hydraulic system (Ref. TASK 29-14-00-614-001).

 (4)
 De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).


 Subtask 12-36-29-010-094
 B. Get Access
 (1)
 Open the left MLG door (Ref. TASK 32-12-00-010-001).

 (2)
 Open the access doors 197EB, 197FB.

 


 Blue Hydraulic System of the CSM/G 8XE - Flushing Schematic
 Figure 311/TASK 12-36-29-991-011

 

 Subtask 12-36-29-860-081

 C. Preparation for the Flushing Procedure
 (1)
 Put the warning notices in position.

 (2)
 Put the safety barriers in position.

 (3)
 Put an access platform in position at the Zone 147.

 (4)
 Put an access platform in position at the Zone 197.

 (5)
 Put the containers in position to collect the hydraulic fluid below:

 -
the CSM/G 8XE,

 -
the LP filter 2002GM.

 

 (6)
 Disconnect the case drain line from the LP filter 2002GM.

 (7)
 Disconnect the pressure line from the CSM/G 8XE.

 (8)
 Disconnect the case drain line from the CSM/G 8XE.

 (9)
 Connect the pressure line to the case drain line at the CSM/G 8XE with a union.


 CAUTION : MAKE SURE THAT THE FLOW RATE AND THE SUPPLY PRESSURE ON THE
_______
 GROUND HYDRAULIC CART ARE SET TO A MINIMUM.

 (10)
 Put the hydraulic power cart in position as necessary.

 (11)
 Connect the pressure hose of the hydraulic power cart to the delivery connector 2008GM with an adaptor.

 (12)
 Connect the return hose of the hydraulic power cart to the case drain line at the LP filter 2002GM with an adaptor.

 (13)
 Put blanking plugs on the disconnected line ends.

 

 4. Procedure
_________

 (Ref. Fig. 311/TASK 12-36-29-991-011) Subtask 12-36-29-170-060
 A. Flush the Blue hydraulic system.
 (1) Operate the hydraulic power cart for 20 s at 20 bar (290.0754 psi).
 (2) Stop the hydraulic power cart. Subtask 12-36-29-960-060
 B. Replace the LP filter element (Ref. TASK 29-12-44-610-001).
 5. Close-up
________ Subtask 12-36-29-860-082
 A. Put the system back to the serviceable condition.
 (1)
 Disconnect the pressure hose of the hydraulic power cart and the adaptor from the delivery connector 2008GM.

 (2)
 Disconnect the return hose of the hydraulic power cart and the adaptor from the case drain line.

 (3)
 Disconnect and remove the union from the case drain line and the pressure line at the CSM/G 8XE.

 (4)
 Remove the hydraulic power cart.

 (5)
 Remove the blanking plugs.

 (6)
 Connect the case drain line to the LP filter 2002GM.

 (7)
 Connect the case drain line to the CSM/G 8XE.

 (8)
 Connect the pressure line to the CSM/G 8XE.

 


 Subtask 12-36-29-790-060

 B. Leak Test of the Components which were Disconnected
 (1)
 Pressurize the Blue hydraulic system (Ref. TASK 29-10-00-863-003).

 (2)
 Make sure that there is no hydraulic fluid leakage.


 (3)
 Depressurize the Blue hydraulic system (Ref. TASK 29-10-00-864-003). Subtask 12-36-29-942-099

 C. Put the aircraft back to its initial configuration.
 (1)
 Remove the containers.

 (2)
 Remove the safety barriers.

 (3)
 Remove the access platform(s).

 

 (4)
 Remove the warning notice(s). Subtask 12-36-29-410-081


 D. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Close the left MLG door (Ref. TASK 32-12-00-410-001).

 (3)
 Close the access door 197EB, 197FB.

 (4)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.

 

 TASK 12-36-29-170-012


 Flushing of the Green Hydraulic System of the Trimmable Horizontal Stabilizer (THS) Actuator 9CE
 WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
 START A TASK ON OR NEAR:


 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM SERVICING 2(109)