B. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 04-004 USA MIL-PRF-23827 TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)
Material No. 04-022 USA MIL-PRF-81322 GRADE 2
SYNTHE.HYDROCARBON GREASE HIGH PRESSURE
(Ref. 20-31-00)
Material No. 11-026 GB DEF-STAN 68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
Material No. 19-003 USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)
C. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
32-00-00-481-001 Installation of the Safety Devices on the Landing
Gears
32-12-00-010-001 Open the Main Gear Doors for Access
32-12-00-410-001 Close the Main Gear Doors after Access
SIL 12-008 (for corrective action)
R **ON A/C 004-049, 053-099, 101-149, 151-199, 201-299, 401-499,
12-22-32-991-001-A Fig. 301
**ON A/C 051-052,
12-22-32-991-001-C Fig. 301A
**ON A/C 301-399,
12-22-32-991-001-B Fig. 301B -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
R **ON A/C 001-003, 051-052,
R Post SB 57-1104 For A/C 051-052,
R 12-22-32-991-001 Fig. 301C
**ON A/C ALL
12-22-32-991-002 Fig. 302
3. Job Set-up
__________
Subtask 12-22-32-941-050
A. Safety Precautions
(1)
Put the safety barriers in position.
(2)
Make sure that the ground safety locks are installed on the landing gear (Ref. TASK 32-00-00-481-001).
(3)
On the panel 400VU:
-make sure that the landing-gear control-lever (6GA) is in the DOWN position
-put a warning notice in position to tell persons not to operate the landing gear.
(4)
Put a warning notice in position to tell persons not to operate the landing gear doors.
Subtask 12-22-32-010-050
B. Get Access
(1)
Put the adjustable access platform in position adjacent to the applicable MLG.
(2)
Open the applicable MLG door (Ref. TASK 32-12-00-010-001).
(3)
Make sure that a GROUND LOCK SLEEVE (460005835) is installed on the applicable MLG door actuating cylinder.
Subtask 12-22-32-640-055
C. Preparation of the Equipment
(1)
Make sure that the lubrication equipment is in the correct condition before you fill it.
(2)
Operate the lubrication equipment to make sure that the lines and adaptor are full of new lubricant.
(3)
Clean the greasers with a clean MISCELLANEOUS (Material No. 19-003) and CLEANING AGENTS (Material No. 11-026).
4. Procedure
_________ R **ON A/C 004-049, 053-099, 101-149, 151-199, 201-299, 401-499,
(Ref. Fig. 301/TASK 12-22-32-991-001-A)
**ON A/C 051-052,
(Ref. Fig. 301A/TASK 12-22-32-991-001-C)
**ON A/C 301-399,
(Ref. Fig. 301B/TASK 12-22-32-991-001-B)
**ON A/C 001-003, 051-052,
Post SB 57-1104 For A/C 051-052,
(Ref. Fig. 301C/TASK 12-22-32-991-001)
**ON A/C ALL
(Ref. Fig. 302/TASK 12-22-32-991-002) Subtask 12-22-32-640-057
A. Lubrication of the MLG NOTE : Use the Figures together with the Tables that follow, to find the
____
greasers.
(1) Lubricate the MLG Uplock: CAUTION : DO NOT OPERATE POWER-OPERATED LUBRICATION EQUIPMENT AT MORE
_______ THAN 207 bars (3000 psi). HIGH LUBRICATION PRESSURE CAN CAUSE DAMAGE TO THE AIRCRAFT.
NOTE : In the step that follows, make sure that the Materials No.