R Lubrication of Sliding Windows Mechanism Tracks Figure 301/TASK 12-22-56-991-001
1EFF : 1 1 1CES ALL 1 111 12-22-56 Page 303 Feb 01/02
5. Close-up
________ Subtask 12-22-56-942-050
A. Close Access
(1)
Install the sliding window lining (Ref. TASK 56-12-11-400-001)
(2)
Close the right and the left sliding window.
(3)
Make sure that the work area is clean and clear of tool(s) and other items.
(4)
Remove the access platform(s).
DRAINAGE - DESCRIPTION AND OPERATION
____________________________________
1. General
_______
A. The drainage points and their locations are specified in 12-00-00 page 1.
AIR DATA SYSTEM - SERVICING
___________________________
TASK 12-24-34-600-001 Bleeding of the Standby Air Data System
1.
Reason for the Job
__________________
Remove water from the Standby Air Data System.
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific container
No specific access platform 1.6 m (5 ft. 3 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-24-34-991-001 Fig. 301
3. Job Set-up
__________ Subtask 12-24-34-860-051
A. Put the access platform in position in the zone 120, opposite the access door 811.
Subtask 12-24-34-010-050
B. Open the access door 811.
4. Procedure
_________
(Ref. Fig. 301/TASK 12-24-34-991-001) Subtask 12-24-34-680-050
A. Aircraft Maintenance Configuration
(1)
Put the container in position under the water drain (1).
(2)
Release the protection plug (2) from the water drain (1).
(3)
Turn the protection plug (2) 180 degrees and put it into the drain valve.
(4)
Push the drain valve until the water in the standby static pressure lines is removed.
(5)
Install the protection plug (2) on the water drain (1) and lock it.
5. Close-up
________ Subtask 12-24-34-860-050
A. Put the aircraft back to its initial configuration.
(1)
Remove the container.
(2)
Make sure that the work area is clean and clear of tool(s) and other items.
(3)
Remove all the grounding connectors, the maintenance equipment, the special tools and the standard tools, the ground power units, the filling equipment and the other items of equipment.
Subtask 12-24-34-410-050
B. Close Access
(1)
Close the access door 811.
(2)
Remove the access platform(s).
Standby Air Data System Water Drain
Figure 301/TASK 12-24-34-991-001
1EFF : ALL 1 12-24-34 Page 303
1 1 Feb 01/98
1 1
1CES 1
POTABLE WATER SYSTEM - MAINTENANCE PRACTICES
____________________________________________
TASK 12-24-38-680-001
Draining of the Potable Water System (with Electrical Power)
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment