REFERENCE DESIGNATION
-------------------------------------------------------------------------------
25-23-45-400-006 Installation of the Door Frame Linings at the Left FWD Passenger/Crew Door
25-23-45-400-007 Installation of the Door Frame Linings at the Right FWD Passenger/Crew Door
25-23-45-400-008 Installation of the Door Frame Linings at the Left AFT Passenger/Crew Door
52-10-00-010-001 Opening of the Passenger/Crew Door
52-10-00-410-001 Closing of the Passenger/Crew Door
52-10-00-860-001 Special Precautions before Work on the Passenger/Crew Door
52-10-00-860-002 Special Precautions after Work on the Passenger/Crew Door
12-22-52-991-007 Fig. 303
3. Job Set-up__________
Subtask 12-22-52-010-054-A
A. Get Access
(1)
Make sure that the control handle of the emergency-escape slide at the applicable passenger/crew door is safetied in the disarmed position (Ref. TASK 52-10-00-860-001).
(2)
Open the applicable passenger/crew door as required (Ref. TASK 52-10-00-010-001).
(3)
Make sure that the access platform is in position below the opened passenger/crew door.
(4)
Remove the door frame linings 221VW (Ref. TASK 25-23-45-000-005) 222VW (Ref. TASK 25-23-45-000-002) 261UW (Ref. TASK 25-23-45-000-003) or 262UW (Ref. TASK 25-23-45-000-004) as required.
(5)
Remove the insulation blankets from the applicable door frame as required.
1EFF : ALL 1 12-22-52Page 315 1 1 May 01/05R 1 1 1CES 1
4. Procedure
_________ Subtask 12-22-52-640-054
A. Lubrication of the Proximity Switch Actuating-Mechanism
(Ref. Fig. 303/TASK 12-22-52-991-007)
(1)
Apply OILS (Material No. 03-001) to the pivot points of the actuation lever (1).
(2)
Apply OILS (Material No. 03-001) to the pivot point of the target lever (2).
(3)
Remove the unwanted oil with a lint-free cloth.
5. Close-up
________ Subtask 12-22-52-410-054-A
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Install the removed insulation blankets on the applicable passenger/crew doors.
(3)
Install the applicable door frame linings 221VW (Ref. TASK 25-23-45-400-006) 222VW (Ref. TASK 25-23-45-400-007) 261UW (Ref. TASK 25-23-45-400-008) or 262UW (Ref. TASK 25-23-45-400-005).
(4)
Do the special precautions on the passenger/crew door after maintenance (Ref. TASK 52-10-00-860-002).
(5)
Close the applicable passenger/crew doors (Ref. TASK 52-10-00-410-001).
(6)
Remove the access platform(s).
1EFF : ALL 1 12-22-52Page 316 1 1 May 01/05R 1 1 1CES 1
Actuating Mechanism of Proximity Switches Figure 303/TASK 12-22-52-991-007
1EFF : 1 1R 1CES ALL 1 11 1 12-22-52 Page 317 May 01/05
TASK 12-22-52-640-006
Lubrication of the External Control Handles of the FWD and AFT Passenger/Crew Doors
WARNING : MAKE SURE THAT THERE IS A GOOD FLOW OF AIR THROUGH THE WORK AREA WHEN
_______ YOU USE SPECIAL MATERIALS. IF YOU GET ONE OF THESE MATERIALS ON YOUR SKIN, IN YOUR MOUTH OR IN YOUR EYES : -FLUSH IT AWAY WITH A FLOW OF CLEAN WATER FOR BETWEEN 10 AND 15 MINUTES. -GET IMMEDIATE MEDICAL AID IF IRRITATION OCCURS. DO NOT BREATHE THE FUMES FROM THE MATERIAL. DO NOT SMOKE WHEN YOU USE THE MATERIAL. DO NOT USE THE MATERIAL NEAR A FLAME, SPARKS OR SOURCES OF HEAT. THESE MATERIALS ARE DANGEROUS : THEY ARE POISONOUS, FLAMMABLE AND SKIN IRRITANTS.
1. Reason for the Job
__________________
Refer to the MPD TASK: 521121-01
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM SERVICING 2(26)