• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-02-12 09:19来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

__________________
 Refer to the MPD TASK: 274000-01


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific warning notices
 No specific access platform 3.60 m (11 ft. 10 in.)

 

 B. Consumable Materials
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
R  Material No. 04-004 USA MIL-PRF-23827 TYPE I SYNTH.ESTER BASED GREASE HIGH PRESSURE (Ref. 20-31-00)
 C. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
29-10-00-864-001 Depressurize the Green Hydraulic System
 29-10-00-864-002 Depressurize the Yellow Hydraulic System
 29-10-00-864-003 Depressurize the Blue Hydraulic System
 12-22-53-991-001 Fig. 301

 3. Job Set-up
__________
 Subtask 12-22-53-860-050

 A. Aircraft Configuration
 (1)
 Make sure that the hydraulic systems are depressurized (Ref. TASK 29-10-00-864-001), (Ref. TASK 29-10-00-864-002), (Ref. TASK 29-10-00-864-003) and install the warning notices to prevent pressurization.

 (2)
 Make sure that the pitch-trim control wheel is at zero.


 (3) Make sure that the elevator controls are at zero.
 Subtask 12-22-53-941-050

 B. Get Access
 (1) Put an access platform in position at the zone 310.


 Subtask 12-22-53-010-050

 C. Open Access
 (1)
 Put the warning notices in position in the cockpit to prevent the operation of the flight controls.

 (2)
 Open the access door 314AR.


 4. Procedure
_________ Subtask 12-22-53-640-050
 A. Lubricate the attach and the hinge fittings with COMMON GREASE (Material No. 04-004) (Ref. Fig. 301/TASK 12-22-53-991-001)
 5. Close-up
________ Subtask 12-22-53-410-050
 A. Close the access door 314AR. Subtask 12-22-53-942-050
 B. Close Access
 (1)
 Remove the warning notice(s).

 (2)
 Remove the access platform(s).

 (3)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.

 


 Lubrication Points of the Hinge and Attach Fittings of the Horizontal
 Stabilizer
 Figure 301/TASK 12-22-53-991-001

 

 STABILIZERS - SERVICING
_______________________
 TASK 12-22-55-640-001
 Lubrication of the Rudder Bearing No. 6
 WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
 START A TASK ON OR NEAR:

 -
THE FLIGHT CONTROLS

 -
THE FLIGHT CONTROL SURFACES

 -
THE LANDING GEAR AND THE RELATED DOORS


 -COMPONENTS THAT MOVE.
 WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
 CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.

 1. Reason for the Job
__________________
R Refer to the MPD TASK: 272400-03
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
 No specific clean cloth
 No specific warning notices
 No specific access platform 9.0 m (29 ft. 6 in.)

 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 04-004  USA MIL-PRF-23827 TYPE I
 SYNTH.ESTER BASED GREASE HIGH PRESSURE
 (Ref. 20-31-00)

 

 C. Referenced Information

 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
29-10-00-864-001 Depressurize the Green Hydraulic System 29-10-00-864-002 Depressurize the Yellow Hydraulic System 29-10-00-864-003 Depressurize the Blue Hydraulic System 12-22-55-991-001 Fig. 301
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM SERVICING 2(35)