• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-02-12 09:19来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 -------------------------------------------------------------------------------
REFERENCE  QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific 1 ACCESS PLATFORM 2M (6 FT)
 No specific 1 HOSE - DRAIN

 B. Consumable Materials
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
Material No. 19-003  USA AMS 3819
 LINT-FREE COTTON CLOTH (Ref. 20-31-00)

 C. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
12-31-38-660-001  Cold Weather Maintenance - Water/Waste
 24-42-00-861-001  Energize the Ground Service Network from the External Power
 24-42-00-862-001  De-energize the Ground Service Network Supplied from the External Power
R **ON A/C 001-049, 051-099, 101-149, 201-299,
 12-24-38-991-004-A  Fig. 201


 -------------------------------------------------------------------------------
REFERENCE DESIGNATION -------------------------------------------------------------------------------
R **ON A/C 151-199, 301-399, 401-499,
 12-24-38-991-004-B Fig. 201A
 **ON A/C ALL

 3. Job Set-up
__________
 Subtask 12-24-38-680-050

 A. Draining of the Potable water System CAUTION : MAKE SURE THAT THE DRAIN VALVES REMAIN OPEN AFTER YOU DRAIN THE
_______
 POTABLE WATER SYSTEM IF :

 -
THE BLEED AIR SYSTEM IS "OFF" AND

 -
THE OUTSIDE AIR TEMPERATURE IS BELOW 0 DEG.C (32 DEG.F). THIS WILL PREVENT DAMAGE TO THE POTABLE WATER SYSTEM.


 (1) You must drain the water system when the outside air temperature is as shown in the table.


 Table 1 - Water System Drain Configuration

 -------------------------------------------------------------------------------| Configuration | Ex | Water Tank| Purge | |----------------------------------------------|posure | Drain | of | | Air | Cabin | Outside |Time in| Required | System | |Conditioning| Temperature | Air |(Hours:| | Required | | | | Temperature | Min) | | | |------------|-------------|-------------------|-------|-----------|----------| | | Above | Between | | | | | | | 0 and -15 DEG.C | Any | NO | | | ON | 10 DEG. C | 32 and 5 DEG.F | | | | | | 50 DEG. F |-------------------|-------|-----------| | | | | Below | | | NO | | | |-15 DEG.C 5 DEG.F | 1:15 | | | |------------|-------------|-------------------|-------| | | | | | Between | | | | | | | 0 and -7 DEG.C | 1:30 | | | | | | 32 and 19.4 DEG.F | | | | | | |-------------------|-------| YES |----------| | OFF | | Between | | | | | | |-7 and -15 DEG.C | 0:30 | | | | | | 19.4 and 5 DEG.F | | | YES | | | |-------------------|-------| | | | | | Below | | | | | | |-15 DEG.C 5 DEG.F | Any | | | |-----------------------------------------------------------------------------| | You must refill the tank with water not more than 30 minutes before you | | start the engines. If the temperature in the aircraft is below 4 DEG.C | | (39.2 DEG.F), pre-condition the aircraft (Ref. 12-33-21 Page 2). | ------------------------------------------------------------------------------
NOTE : To purge the potable water system when the outside air
____ temperature is -7 DEG.C and lower, refer to the Cold Weather Maintenance (Ref 12-31-38 Page 2).
 Subtask 12-24-38-861-051
 B. Energize the ground service network
 (Ref. TASK 24-42-00-861-001).

R **ON A/C 001-049, 051-099, 101-149, 201-299,
 Subtask 12-24-38-865-051-D
 C. Make sure that this(these) circuit breaker(s) is(are) closed:


 -------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------2000VU WATER SYS - QUANT IND 1MA B01 2001VU WATER SYS - DRAIN 1MP B05
 Subtask 12-24-38-941-052-D
 D. Put the ACCESS PLATFORM 2M (6 FT) in position at Zones 171, 138, 133.
R **ON A/C 151-199, 301-399, 401-499,
 Subtask 12-24-38-865-051-C
 C. Make sure that this(these) circuit breaker(s) is(are) closed: -------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------
2001VU WATER SYS - QUANT IND 1MA B06 2001VU WATER SYS DRAIN 1MP B05
 Subtask 12-24-38-941-052-C
 D. Put the ACCESS PLATFORM 2M (6 FT) in position at Zones 171, 133.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM SERVICING 2(38)