_
e Check for any transfer from the right wing to the left
_
wing.
「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1R EFF : ALL ∞∞28-25-00∞∞∞∞∞∞∞∞∞∞Page 257
Nov 01/04 CES If such a transfer occurs, do a check of and replace, if necessary, the VALVE-DEFUEL/TRANSFER (11QM) (Ref. AMM TASK 28-25-43-000-001) and (Ref. AMM TASK 28-25-43-400-001).
(6) If no reason for the fuel spillage is known but the problem area has been identified, go to Para. 4.A. and do the tests listed for the (identified) tanks related systems.
(7) If no reason for the fuel spillage is known and no fuel tank malfunction has been identified, go to Para. 4.A. and do all the tests given.
4. Fault Isolation
_______________
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
A. Procedure
NOTE : The tests listed here are a guide only.
____ They can be done in an order (any) best suited to:
- the local conditions in which the fuel spillage occurred
- the tools and equipment available.
If only a test is called for, take any resulting ECAM WARNING(s), failure message(s) and/or observation(s) to TSM Page Block (PB) 101 for the applicable Task number and do the necessary trouble shooting.
(1) Make sure that the applicable refuel (transfer) task, as follows, was/is complied with in all respects:
- Pressure Refuel with Automatic Control (Ref. AMM TASK 12-11-28-650-003)
- Pressure Refuel with Manual Control (Ref. AMM TASK 12-11-28-650-004)
- Pressure Refuel without Electric Power (Ref. AMM TASK 12-11-28-650-005)
- Overwing (Gravity) Refuel (Ref. AMM TASK 12-11-28-650-006)
- Fuel Transfer (Ref. AMM TASK 28-25-00-869-001).
(2) Do the Inspection of the Tank Venting System (Ref. AMM TASK 28-12-00-200-001).
(3) On the opposite side wing to the fuel spillage, do a General Visual Inspection of NACA Vent Intake For Signs of Obstruction (blockage) (Ref. AMM TASK 28-12-47-200-001).
(4) Do an Inspection of the Overpressure Protectors (Wing and Vent Surge Tanks) (Ref. AMM TASK 28-12-41-200-003).
(5) If the fuel spillage was from the left side, do the Inspection of the Overpressure Protector 96QM (Ref. AMM TASK 28-12-41-200-002).
「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞28-25-00∞∞∞∞∞∞∞∞∞∞Page 258
Aug 01/05 CES
(6) Do the Operational Test of the Refuel System (Ref. AMM TASK 28-25-00-710-003).
(7) Do the Operational Test of the Defuel System (Ref. AMM TASK 28-25-00-710-002).
(8) Do the Operational Test of the Crossfeed Valve (Ref. AMM TASK 28-23-00-720-001).
(9) Do a check of and replace, if necessary, items of the vent/surge tank scavenge system that follow:
NOTE : If the vent/surge tank scavenge system is inoperative, the
____ fuel level in the vent/surge tank will increase because it cannot be collected and transferred back into a main tank. If, during these conditions, a fuel surge were to occur during the refuel, less fuel can be held in the vent/surge tank than if it was continuously drained and almost empty. This will increase the possibility of a fuel spillage because the usable capacity of the vent/surge tank has been reduced.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320 Trouble Shooting Manual 排故手册 FUEL 燃油2(85)