• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-28 13:54来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

R rack connector A, contact E
R - aircraft wiring between the FQIC (3QT) rack connector C, contact 7G
R and the IND-FUEL QTY MULTI TANK (6QT) rack connector A, contact N.

R (47) Repair all the unserviceable wiring and connectors.

R (48) Go to Para. 3.A.

R (49) Do a wiring check (Ref. ASM 28-42/03) of the aircraft wiring between
R the FQIC (3QT) rack connector C, contact 4J and the PRESELECTOR-FUEL
R QTY (5QT) connector A, contact M.

R (50) Repair all the unserviceable wiring and connectors.

 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1R EFF : 301-399, ∞∞28-25-00∞∞∞∞∞∞∞∞∞∞Page 216
 May 01/04 CESR (51) Go to Para. 3.A. R (52) Do a check of :

 

R - the FUELLING BUS 2
R - the C/B-FUEL/FQI/CHANNEL 1 AND 2 (8QT) L26 at 121VU.
R (53) Do a wiring check (Ref. ASM 28-42/03) of the aircraft wiring between

R the C/B-FUEL/FQI/CHANNEL 1 AND 2 (8QT) and the FQIC (3QT) rack
R connector C, contact 9E.
R (54) Repair all the unserviceable wiring and connectors.

R (55) Go to Para. 3.A.
R (56) Do a wiring check (Ref. ASM 28-42/03) of the aircraft wiring between
R the FQIC (3QT) rack connector C, contact 4K and the PRESELECTOR-FUEL
R QTY (5QT) connector A, contact L.

R (57) Repair all the unserviceable wiring and connectors.
R (58) Go to Para. 3.A.
R (59) Do a check (Ref. ASM 28-25/01)/replace the SW-REFUEL

R VALVES/OPEN/NORMAL/SHUT, R WING TK (6QU) 800VU.
R (60) Do a wiring check (Ref. ASM 28-25/01) of the aircraft wiring between

R the SW-REFUEL VALVES/OPEN/NORMAL/SHUT, R WING TK (6QU) terminal 3,
R and the FQIC (3QT) rack connector C, contact 8B.
R (61) Repair all the unserviceable wiring and connectors.
R (62) Go to Para. 3.A.
R (63) Do a check (Ref. ASM 28-25/01)/replace the SW-REFUEL

R VALVES/OPEN/NORMAL/SHUT, L WING TK (5QU) 800VU.
R (64) Do a wiring check (Ref. ASM 28-25/01) of the aircraft wiring between

R the SW-REFUEL VALVES/OPEN/NORMAL/SHUT, L WING TK (5QU) terminal 3,
R and the FQIC (3QT) rack connector C, contact 8A.
R (65) Repair all the unserviceable wiring and connectors.
R (66) Go to Para. 3.A.
R (67) Check (Ref. ASM 28-25/01)/replace the SW-REFUEL

R VALVES/OPEN/NORMAL/SHUT, CTR TK (4QU) 800VU.
R (68) Do a wiring check (Ref. ASM 28-25/01) of the aircraft wiring between

R the SW-REFUEL VALVES/OPEN/NORMAL/SHUT, CTR TK (4QU) terminal 3, and
R the FQIC (3QT) rack connector C, contact 9B.
R (69) Repair all the unserviceable wiring and connectors.

 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1R EFF : 301-399, ∞∞28-25-00∞∞∞∞∞∞∞∞∞∞Page 217
 May 01/04 CES

 

R  (70) Go to Para. 3.A. 
R  (71) Do a wiring check (Ref. ASM 28-25/01) of the aircraft wiring between 
R  the FQIC (3QT) rack connector C, contact 8J, and the RELAY-R WING TK 
R  REFUEL VALVE CONTROL (16QU), terminal X1. 
R  (72) Repair all the unserviceable wiring and connectors. 
R  (73) Go to Para. 3.A. 
R  (74) Do a wiring check (Ref. ASM 28-25/01) of the aircraft wiring between 
R  the FQIC (3QT) rack connector C, contact 8K, and the RELAY-L WING TK 
R  REFUEL VALVE CONTROL (15QU), terminal X1. 
R  (75) Repair all the unserviceable wiring and connectors. 
R  (76) Go to Para. 3.A. 
R  (77) Do a wiring check (Ref. ASM 28-25/01) of the aircraft wiring between 
R  the FQIC (3QT) rack connector C, contact 9J, and the RELAY-CTR TK 
R  VALVE CONTROL (17QU), terminal X1. 
R  (78) Repair all the unserviceable wiring and connectors. 
R  (79) Go to Para. 3.A.

 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1R EFF : 301-399, ∞∞28-25-00∞∞∞∞∞∞∞∞∞∞Page 218
 May 01/04 CES

 

R **ON A/C ALL
 TASK 28-25-00-810-803
 Refuel-Valve System Failure in Manual Control (Fails to Open)
 WARNING : OBEY THE FUEL SAFETY PROCEDURES.
_______
R WARNING : WHEN YOU DO WORK ON THE FUEL SYSTEM WIRING, YOU MUST USE TEST
_______ R EQUIPMENT THAT IS APPROVED (REFER TO INTERNATIONAL OR NATIONAL R SPECIFICATIONS FOR INTRINSICALLY SAFE TEST EQUIPMENT, E.G. EN50-020, R UL913 OR EQUIVALENT). TEST EQUIPMENT THAT IS NOT APPROVED CAN CAUSE R FIRE OR AN EXPLOSION.
 CAUTION : DO NOT LET THE REFUEL PRESSURE BE MORE THAN THE MAXIMUM SAFE PRESSURE
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320 Trouble Shooting Manual 排故手册 FUEL 燃油2(67)