Subtask 31-60-00-860-082
A. Put the aircraft back to its initial configuration.
(1)
On the MCDU, push the line key adjacent to the RETURN indication until the MAINTENANCE MENU 1/2 page comes into view
(2)
Do the EIS Stop Procedure (Ref. TASK 31-60-00-860-002)
(3)
On the MCDU, set the BRT knob to OFF
R 1EFF : 401-499, 1 31-60-00Page 560 1 1 Aug 01/05 1 1 1CES 1
(4)
De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002)
(5)
Make sure that the work area is clean and clear of tool(s) and other items.
R 1EFF : 401-499, 1 31-60-00Page 561 1 1 Aug 01/05 1 1 1CES 1 TASK 31-60-00-720-002
1. Reason for the Job
Operational Test of the DMC/DU data bus __________________ Self Explanatory
2. Job Set-up Information______________________
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power
24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power
31-32-00-860-008 Procedure to Get Access to the SYSTEM
REPORT/TEST/INST Page 31-60-00-860-001 EIS Start Procedure 31-60-00-860-002 EIS Stop Procedure
3. Job Set-up
__________ Subtask 31-60-00-860-083
A. Aircraft Maintenance Configuration
(1)
Energize the aircraft electrical circuits
(Ref. TASK 24-41-00-861-002)
(2)
Do the EIS start procedure (Ref. TASK 31-60-00-860-001)
(3)
On one MCDU, get the SYSTEM REPORT/TEST INST menu page (Ref. TASK 31-32-00-860-008)
R 1EFF : 401-499, 1 31-60-00Page 562 1 1 Aug 01/05 1 1 1CES 1 Subtask 31-60-00-865-065
B. Make sure that this(these) circuit breaker(s) is(are) closed:
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
49VU EIS/ECAM/CTL/PNL 15WT E12
49VU EIS/DMC1/SPLY 10WT1 E11
49VU EIS/DMC3/STBY/SPLY 14WT1 E10
49VU EIS/DMC1/SWTG 21WT1 E09
49VU EIS/DMC3/SWTG 21WT3 E07
49VU EIS/ECAM DU/UPPER/SWTG 24WT1 E06
49VU EIS/ECAM DU/UPPER/SPLY 13WT1 E05
49VU EIS/PFD CAPT/SWTG 22WT1 E04
49VU EIS/PFD/CAPT/SPLY 11WT1 E03
49VU EIS/ND CAPT/SWTG 23WT1 E02
49VU EIS/ND CAPT/SPLY 12WT1 E01
49VU SDAC/1/SPLY 3WV F04
49VU FWS/FWC1/SPLY 3WW F01
121VU EIS/DMC3/SPLY 10WT3 Q09
121VU EIS/DMC2/SPLY 10WT2 Q08
121VU EIS/FWC2/SPLY 2WW Q07
121VU EIS/SDAC/2/SPLY 2WV Q06
121VU EIS/ECAM DU/LOWER/SPLY 13WT2 R11
121VU EIS/ECAM DU/LOWER/SWTG 24WT2 R10
121VU EIS/DMC2/SWTG 21WT2 R08
121VU EIS/ND/F/O/SWTG 23WT2 R06
121VU EIS/PFD/F/O/SWTG 22WT2 R05
121VU EIS/ND/F/O 12WT2 R04
121VU EIS/PFD/F/O 11WT2 R03
122VU ELEC/AC/BUS1/CTL 17XN1 V25
R 1EFF : 401-499, 1 31-60-00Page 563 1 1 Aug 01/05 1 1 1CES 1
4. Procedure
_________ Subtask 31-60-00-720-050
A. Operational test of the DMC/DU data bus
-------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
On the MCDU:
press the line key adjacent to the EIS 1 (2), (3) indication
1.
press the line key adjacent to the SWTG/BUS/DU TESTS indication
2.
push the line key adjacent to DATA BUS TEST