• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-25 12:26来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (Ref. TASK 24-41-00-862-002).

 

R 1EFF : 401-499, 1 31-60-00Page 304 1 1 Aug 01/05 1 1 1CES 1 TASK 31-60-00-610-002


 1. Reason for the Job
 X LOADING Procedure of the DMC2 to the PFD F/O or the ND F/O __________________ Self Explanatory
 2. Job Set-up Information______________________
 A. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
24-41-00-861-002  Energize the Aircraft Electrical Circuits from the External Power
 24-41-00-862-002  De-energize the Aircraft Electrical Circuits Supplied from the External Power
 31-32-00-860-008  Procedure to Get Access to the SYSTEM
 REPORT/TEST/INST Page 31-60-00-860-001 EIS Start Procedure 31-60-00-860-002 EIS Stop Procedure
 3. Job Set-up
__________ Subtask 31-60-00-869-066
 A. Aircraft Maintenance Configuration
 (1)
 Energize the aircraft electrical circuits
 (Ref. TASK 24-41-00-861-002)


 (2)
 Do the EIS start procedure (Ref. TASK 31-60-00-860-001)

 (3)
 On one MCDU, get the SYSTEM REPORT/TEST INST menu page (Ref. TASK 31-32-00-860-008)


R 1EFF : 401-499, 1 31-60-00Page 305 1 1 Aug 01/05 1 1 1CES 1 Subtask 31-60-00-865-057


 B. Make sure that this(these) circuit breaker(s) is(are) closed:
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU EIS/ECAM/CTL/PNL 15WT E12 49VU EIS/DMC1/SPLY 10WT1 E11 49VU EIS/DMC3/STBY/SPLY 14WT1 E10 49VU EIS/DMC1/SWTG 21WT1 E09 49VU EIS/DMC3/SWTG 21WT3 E07 121VU EIS/DMC3/SPLY 10WT3 Q09 121VU EIS/DMC2/SPLY 10WT2 Q08 121VU EIS/DMC2/SWTG 21WT2 R08
 4. Procedure
_________
 Subtask 31-60-00-610-051
 A. Crossloading of the DMC2 data to F/O PFD and F/O ND
 NOTE : The procedure is for the FO PFD. For the FO ND, use the
____
 indications between parentheses.

 NOTE : Crossloading is possible only if the target DUs (DUs to which you
____ crossload data) have an EIS software PN different than that of the source DMC. You can crossload data to all the DUs at the same time.
 -------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
1. On the MCDU::  On the MCDU:
 - press the line key adjacent to  - the DMC2 main menu page comes into
 the EIS2 indication  view.
 On the PFD F/O (ND F/O) Display Unit:
 - the green MAINTENANCE MODE message
 comes into view.
 2. On the MCDU:  On the MCDU:
 - press the line key adjacent to  - the page DMC2 PIN PROG/STATUS AND
 the PIN PROG/STATUS AND XLOAD  XLOAD comes into view
 indication
 3. On the MCDU:  On the MCDU: 

R 1EFF : 401-499, 1 31-60-00Page 306 1 1 Aug 01/05 1 1 1CES 1


 -------------------------------------------------------------------------------
ACTION RESULT -------------------------------------------------------------------------------
-press the line key adjacent to the DU XLOAD indication
4. On the MCDU:
-press the line key adjacent to ACCESS XLOAD
5.
 On the MCDU:

- obey the instructions refered to as: INITIAL CONDITIONS and press the line key adjacent to START XLOAD

6.
 XLOAD process


-wait for 10 minutes maximum
7. On the MCDU:
-press the line key adjacent to the RETURN indication
8. On the MCDU:
-the page DMC2 DU XLOAD comes intoview
 -make sure that on the F/O PFD DU (F/O ND DU): the EIS software P/N is amber or empty
On the MCDU:
-
the page DMC2 DU XLOAD with initialconditions comes into view

On the MCDU:

-
the page DMC2 DU XLOAD comes intoview with the message TRANSFER INPROGRESS andDMC2 TO PFD FO DMC2 TO ND FO MAX 10 MINUTES On the First Officer's PFD DU (ND DU): a large white L comes into view on the screen


On the MCDU:
-DMC1 DU XLOAD comes into view with INTEGRITY CHECK PFD FO ND FO MAX 60 SECONDS On the PFD F/O (ND F/O) display unit:
 -the message SELF TEST IN PROGRESS (MAX 40 SECONDS) comes into view
 -make sure that the message MAINTENANCE MODE comes into view On the MCDU:
 -
the message PFD F/O (ND F/O): XLOAD COMPLETED is displayed in green

On the MCDU:

-
the page DMC2 DU X LOAD comes intoview with, on the same line as the PFD F/O (ND F/O) DU, the EIS software P/N is displayed in green
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 指示/记录系统 7(67)