-------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
1. On the MCDU::
-press the line key adjacent to the EIS2 indication
2. On the MCDU:
-press the line key adjacent to the PIN PROG/STATUS AND XLOAD indication
3. On the MCDU:
-press the line key adjacent to the DMC XLOAD indication
4. On the MCDU: On the MCDU:
-
the DMC2 main menu page comes intoview. On the PFD F/O and ND F/O Display Units:
-
the green MAINTENANCE MODE message comes into view.
On the MCDU:
-
the page DMC2 PIN PROG/STATUS ANDXLOAD comes into view
On the MCDU:
-
the page DMC2 DMC XLOAD comes intoview
-make sure that the DMC1-software P/N is amber or empty
On the MCDU:
R 1EFF : 401-499, 1 31-60-00Page 318 1 1 Aug 01/05 1 1 1CES 1
-------------------------------------------------------------------------------
ACTION RESULT -------------------------------------------------------------------------------
- press the line key adjacent to - the page DMC2 DMC XLOAD comes into
ACCESS XLOAD view
5. On the MCDU: On the MCDU:
- press the line key adjacent to - the page DMC2 DMC XLOAD comes into
START XLOAD view with the message TRANSFER IN
PROGRESS DMC2 to DMC1(MAX 10MINUTES)
INVALID DATA amber message comes into
view on the PFD and ND CAPT DU's.
6. X LOAD process On the MCDU:
- wait for 10 minutes maximum - the page DMC2 DMC XLOAD is displayed
with the message INTEGRITY CHECK (MAX
60 SECONDS)
- On the PFD CAPT (ND CAPT) display
unit: INVALID DATA amber message
comes into view
- make sure that the message
MAINTENANCE MODE comes into view on
the EWD and SD
- the page DMC2 DMC XLOAD is displayed
with the message DMC1 XLOAD COMPLETED
in green and the message DMC SELF
TEST IN PROGRESS 40s also in green
7. On the MCDU: On the MCDU:
- press the line key adjacent to - the page DMC2 DMC XLOAD comes into
the RETURN indication after the view with the newly installed
delay software P/N displayed in green on
the line DMC1
8. On the MCDU:
- press the line key adjacent to
RETURN to get back to the main
menu page
R 1EFF : 401-499, 1 31-60-00Page 319 1 1 Aug 01/05 1 1 1CES 1
5. Close-up
________ Subtask 31-60-00-860-087
A. Put the aircraft back to its initial configuration.
(1)
Do the EIS stop procedure (Ref. TASK 31-60-00-860-002).
(2)
Make sure that the work area is clean and clear of tool(s) and other items.
(3)
De-energize the aircraft electrical circuits
(Ref. TASK 24-41-00-862-002).
R 1EFF : 401-499, 1 31-60-00Page 320 1 1 Aug 01/05 1 1 1CES 1 TASK 31-60-00-610-004
1. Reason for the Job
X LOADING Procedure of the DMC2 __________________ Self Explanatory
2. Job Set-up Information______________________
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power
24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power
31-32-00-860-008 Procedure to Get Access to the SYSTEM
REPORT/TEST/INST Page 31-60-00-860-001 EIS Start Procedure 31-60-00-860-002 EIS Stop Procedure
3. Job Set-up
__________ Subtask 31-60-00-869-068
A. Aircraft Maintenance Configuration
(1)
Energize the aircraft electrical circuits
(Ref. TASK 24-41-00-861-002)
(2)
Do the EIS start procedure (Ref. TASK 31-60-00-860-001)
(3)
On one MCDU, get the SYSTEM REPORT/TEST INST menu page (Ref. TASK 31-32-00-860-008)
R 1EFF : 401-499, 1 31-60-00Page 321 1 1 Aug 01/05 1 1 1CES 1 Subtask 31-60-00-865-059
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 指示/记录系统 7(71)