(2)
Make a mark on the DMC3 (Ref. TASK 31-63-00-440-001).
(3)
Install the DMC3 in the location of the defective DMC (Ref. TASK 31-63-34-400-001).
5. Close-up
________
Subtask 31-63-00-860-057
A. Make sure that the work area is clean and clear of tool(s) and other items.
1EFF : 106-149, 303-399, 1 31-63-00Page 402 1 1 Config-3 Aug 01/05 1 1 1CES 1 TASK 31-63-00-440-003
Reactivation of the DMC (1WT1/1WT2/1WT3) (Installation of the DMC3 in its initial location)
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
31-63-00-040-001 Deactivation of the DMC (1WT1/1WT2/1WT3) 31-63-34-400-001 Installation of the DMC (1WT1,1WT2,1WT3)
3. Job Set-up
__________ Subtask 31-63-00-865-057
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU EIS/DMC3/SWTG 21WT3 E07 121VU EIS/DMC3/SPLY 10WT3 Q09
1EFF : 106-149, 303-399, 1 31-63-00Page 403 1 1 Config-3 Aug 01/05 1 1 1CES 1 Subtask 31-63-00-865-058
B. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------FOR 1WT1
49VU EIS/DMC1/SPLY 10WT1 E11 49VU EIS/DMC1/SWTG 21WT1 E09
FOR 1WT2 121VU EIS/DMC2/SPLY 10WT2 Q08 121VU EIS/DMC2/SWTG 21WT2 R08
4. Procedure
_________
Subtask 31-63-00-420-052
A. Reactivation of the DMC
(1)
Remove the DMC with the mark and install it in the initial location of the DMC3 (Ref. TASK 31-63-00-040-001) (Ref. TASK 31-63-34-400-001).
(2)
Install a new DMC in the initial location of the removed defective DMC1 (DMC2) (Ref. TASK 31-63-34-400-001).
5. Close-up
________
Subtask 31-63-00-860-058
A. Make sure that the work area is clean and clear of tool(s) and other items.
1EFF : 106-149, 303-399, 1 31-63-00Page 404 1 1 Config-3 Aug 01/05 1 1 1CES 1
DISPLAY UNIT (2WT1,2WT2,3WT1,3WT2,4WT1,4WT2) - REMOVAL/INSTALLATION
___________________________________________________________________
TASK 31-63-22-000-001
Removal of the Display Unit (2WT1,2WT2,3WT1,3WT2,4WT1,4WT2)
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
FOR FIN 4WT1, 4WT2
No specific blanking caps
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
31-63-22-991-001 Fig. 401
3. Job Set-up
__________
Subtask 31-63-22-865-050
A. Open, safety and tag this(these) circuit breaker(s): 中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM 指示/记录系统 7(159)