• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-24 08:35来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

R  (Ref. TASK 29-23-00-860-001). 
R  (5) Open one of the main doors of the main gear (Ref. TASK 32-12-00-010-
R  001). 
R  (6) Put the ACCESS PLATFORM 3M (10 FT) in position. 
R  (7) Put the CONTAINER 1 L (1/4 USGAL) below the filter to collect the 
R  unwanted hydraulic fluid. 
R  4. Procedure_________ 
R  (Ref. Fig. 301/TASK 29-11-45-991-001) 
R  Subtask 29-11-45-020-051 
R  A. Removal of the Clogging Indicator 
R  (1) Loosen and remove the clogging indicator (4) from the filter head 
R  (1). 
R  (2) Remove and discard the packings (7) from the clogging indicator (4). 
R  (3) Remove and retain the ring (6) from the clogging indicator (4). 
R  Subtask 29-11-45-560-051 
R  B. Preparation for Installation 
R  (1) Put the ring (6) on the clogging indicator (4). 
R  (2) Lubricate the new packings (7) with the HYDRAULIC FLUIDS (Material 
R  No. 02-003) and install them on the clogging indicator (4). 
R  (3) Lubricate the threads of the clogging indicator (4) with the 
R  HYDRAULIC FLUIDS (Material No. 02-003).

 

R Subtask 29-11-45-420-051

R  C. Installation of the Clogging Indicator 
R  (1) Clean the component interface and/or the adjacent area. 
R  (2) Do an inspection of the component interface and/or the adjacent area. 
R  (3) Install the new clogging indicator (4) in the filter head (1). 
R  Subtask 29-11-45-942-052 
R  D. Safety Precautions 
R  (1) Remove the warning notice(s). 
R  Subtask 29-11-45-790-051 
R  E. Test of the Filter Assembly 
R  (1) Presssurize the reservoir of the Green hydraulic system (Ref. TASK 
R  29-14-00-614-002). 
R  (2) Pressurize the Green hydraulic system (Ref. TASK 29-10-00-863-001). 
R  (3) Make sure that the clogging indicator stays in. 
R  (4) Make sure that no hydraulic fluid comes out of the filter assembly. 
R  (5) Depressurize the Green hydraulic system (Ref. TASK 29-10-00-864-001). 
R  5. Close-up________ 
R  Subtask 29-11-45-860-054 
R  A. Put the aircraft back to the serviceable condition. 
R  (1) Make sure that the fluid level in the Green reservoir is correct. Add 
R  fluid as necessary (Ref. TASK 12-12-29-611-001). 
R  (2) Remove the container from below the filter. 
R  (3) Connect the PTU isolation coupling (Ref. TASK 29-23-00-860-002). 
R  (4) Make sure that the work area is clean and clear of tool(s) and other 
R  items.

 

R (5) Remove the access platform(s).
R (6) Close the main door of the main gear (Ref. TASK 32-12-00-410-001).

 

 SLIDE - COMPENSATED (1010GM) - REMOVAL/INSTALLATION
___________________________________________________
 TASK 29-11-47-000-001
 Removal of the Compensated Slide 1010GM
 WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______ START A TASK ON OR NEAR:
 -
THE FLIGHT CONTROLS

 -
THE FLIGHT CONTROL SURFACES

 -
THE LANDING GEAR AND THE RELATED DOORS


 -COMPONENTS THAT MOVE.
 WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______ GEAR.
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking plugs No specific safety barriers No specific warning notice No specific access platform 3 m (9 ft. 10 in.) No specific container 5 l (1.3208 USgal)
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
 Configuration before Maintenance Action 29-00-00-910-002 Safety Procedures of the Hydraulic System 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs 29-23-00-860-001 Disconnection of the Isolation Coupling of the Power
 Transfer Unit (PTU) 29-11-47-991-001 Fig. 401
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM HYDRAULIC POWER 液压2(86)