• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-24 08:35来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者


R 1EFF : 001-049, 051-058, 101-101, 1 29-11-15Page 414 1 1 May 01/05 1 1 1CES 1


 (w)
 Put the new square-section seals (65) in position on the sides of the bobbins (30) without the identification grooves (equipment side).

 (x)
 Put the new back-up rings (31) in position on the sides of the bobbins (30) with the identification grooves (manifold side).

 (y)
 Put the new O-rings (63) in position on the sides of the bobbins

 (30) with the identification grooves (manifold side).

 (z)
 Install the bobbins (30) with the identification grooves in the ports of the manifold (35) (Ref. TASK 20-23-21-911-001). (aa) Install the priority valve 1064GM (Ref. TASK 29-11-33-400-001). (ab) Install the PTU solenoid valve 1012GL (Ref. TASK 29-23-51-400-001). (ac) Install the brake selector valve 23GG (Ref. TASK 32-42-11-400-


001). Subtask 29-11-15-420-050
 B. Installation of the Manifold CAUTION : USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN
_______ YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU USE THE SECOND WRENCH, YOU WILL NOT LOOSEN OR TIGHTEN THE UNION TOO MUCH.
 CAUTION : YOU MUST INSTALL HYDRAULIC TUBES WITH HYDRAULIC FLUID AS
_______
 LUBRICANT.

 (1)
 Remove the sealant from the mating surface of the manifold (35) and the aircraft structure with a plastic or wooden scraper.

 (2)
 Examine the structure of the aircraft in the area of the manifold attachment for cracks, corrosion or other damage.

 (3)
 Apply a layer of SEALANTS (Material No. 09-018) to the mating surface of the manifold (35).

 (4)
 Put the manifold (35) and the spacer (13) in position on the aircraft and install the four washers (12) and nuts (11). Do not tighten the nuts (11).


R 1EFF : 001-049, 051-058, 101-101, 1 29-11-15Page 415 1 1 May 01/05 1 1 1CES 1


 (5)
 Remove the blanking plugs from the pipe end-fittings and the unions on the manifold (35).

 (6)
 Make sure that the hydraulic line end-fittings are serviceable.

 (7)
 Apply HYDRAULIC FLUIDS (Material No. 02-003) to the threads of the
 pipe end-fittings.


 (8)
 Connect the pipe (25) to the union (27).

 (9)
 TORQUE the pipe end-fitting (26) to between 9.7 and 10.7 m.daN (71.53 and 78.90 lbf.ft).


 (10)
 Connect the pipe (21) to the union (23).

 (11)
 TORQUE the pipe end-fitting (22) to between 2.9 and 3.2 m.daN (21.38 and 23.59 lbf.ft).

 (12)
 Install the pipe (17) between the union (19) and the filter 2584GM.

 (13)
 TORQUE the pipe end-fittings (18),(54) to between 5.4 and 5.9 m.daN

 (39.82 and 43.51 lbf.ft).

 (14)
 Connect the pipe (1) to the union (3).

 (15)
 TORQUE the pipe end-fitting (2) to between 7.5 and 8.3 m.daN (55.30 and 61.20 lbf.ft).

 (16)
 Install the pipe (32) between the union (43) and the check valve 1093GM.

 (17)
 TORQUE the pipe end-fittings (33),(42) to between 7.5 and 8.3 m.daN

 (55.30 and 61.20 lbf.ft).

 (18)
 Install the pipe (7) between the unions (9),(41).

 (19)
 TORQUE the pipe end-fittings (8),(40) to between 9.7 and 10.7 m.daN

 (71.53 and 78.90 lbf.ft).

 (20)
 TORQUE the nuts (11) to between 0.7 and 0.8 m.daN (61.94 and 70.79 lbf.in).

 (21)
 Connect the bonding jumper (51) to the structural attachment (52). Install the bolt (49), the washer (50) and the nut (53).

 (22)
 Tighten the nut (53).


R 1EFF : 001-049, 051-058, 101-101, 1 29-11-15Page 416 1 1 May 01/05 1 1 1CES 1


 (23)
 Connect the bonding jumper (46) to the structural attachment (47). Install the bolt (44), the washer (45) and the nut (48).

 (24)
 Tighten the nut (48).

 (25)
 Seal the connections of the bonding jumpers (46),(51) with SEALANTS (Material No. 09-013).

 (26)
 Apply STRUCTURE PAINTS (Material No. 16-003) (dyed blue) to the sealant.

 (27)
 Remove the blanking caps from the electrical connections.

 (28)
 Make sure that the electrical connectors are clean and in the correct condition.

 (29)
 Connect the electrical connectors (29),(36) to the receptacles on the manifold (35).

 

R **ON A/C 059-099, 102-149, 151-199, 201-299, 301-399, 401-499,
 Subtask 29-11-15-560-050-A
 A. Preparation of the Replacement Component
 (1)
 Remove the components which are attached to the removed manifold (35) as follows:
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM HYDRAULIC POWER 液压2(26)