-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
64 back-up rings 29-11-15 02 -130
64 back-up rings 29-11-15 02A-130
65 square-section seals 29-11-15 02 -140
65 square-section seals 29-11-15 02A-140
66 square-section seals 29-11-15 02 -050
66 square-section seals 29-11-15 02A-050
67 back-up rings 29-11-15 02 -040
67 back-up rings 29-11-15 02A-040
68 back-up rings 29-11-15 02 -030
68 back-up rings 29-11-15 02A-030
D. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
20-23-21-911-001 Removal/Installation of the Bobbins from their
Housings and Installation of O-rings, Square Seals,
and Back-up Rings on the Bobbins
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
29-00-00-910-002 Safety Procedures of the Hydraulic System
29-11-33-000-001 Removal of the Priority Valve of the Green Hydraulic
System (1064GM)
29-11-33-400-001 Installation of the Priority Valve of the Green
Hydraulic System (1064GM)
29-14-00-614-001 Depressurization of the Hydraulic Reservoirs
29-14-00-614-002 Pressurization of the Hydraulic Reservoirs through
the Ground Connector
29-23-00-710-003 Operational Check of PTU Yellow to Green
29-23-00-860-001 Disconnection of the Isolation Coupling of the Power
Transfer Unit (PTU)
29-23-00-860-002 Connection of the Isolation Coupling of the Power
Transfer Unit (PTU)
29-23-51-000-001 Removal of the Solenoid Valve 1012GL of the Power
Transfer Unit
29-23-51-400-001 Installation of the Solenoid Valve 1012GL of the
Power Transfer Unit
32-12-00-010-001 Open the Main Gear Doors for Access
32-12-00-410-001 Close the Main Gear Doors after Access
32-42-11-000-001 Removal of the Brake Selector Valve 23GG
32-42-11-400-001 Installation of the Brake Selector Valve 23GG
1EFF : ALL 1 29-11-15Page 410 1 1 May 01/04R 1 1 1CES 1
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
**ON A/C 001-049, 051-058, 101-101,
29-11-15-991-001 Fig. 401 R **ON A/C 059-099, 102-149, 151-199, 201-299, 301-399, 401-499,
29-11-15-991-001-A Fig. 401A
**ON A/C ALL
3. Job Set-up
__________
Subtask 29-11-15-860-053
A. Aircraft Maintenance Configuration
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
(1)
Obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002).
(2)
Make sure that the warning notices are in position to tell persons not to pressurize the Green hydraulic system:
-in the cockpit on the hydraulic section 40VU of the overhead panel, - on the ground service panel of the Green hydraulic system.
(3)
Make sure that the Green hydraulic system is depressurized and put it in the maintenance configuration. (Ref. TASK 29-00-00-864-001).
(4)
Make sure that the reservoir of the Green hydraulic system is depressurized (Ref. TASK 29-14-00-614-001).
(5)
Make sure that one door of the main gear is open (Ref. TASK 32-12-00-010-001).
(6)
Make sure that the access platform is in position.
(7)
Make sure that the container is in position below the location of the PTU manifold.
(8)
Make sure that the isolation coupling of the Power Transfer Unit (PTU) is disconnected (Ref. TASK 29-23-00-860-001).
Subtask 29-11-15-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
121VU HYDRAULIC/G HYD/PUMP ENG1/CTL 1701GK R35 121VU HYDRAULIC/G HYD/PUMP ENG1/MONG 1702GK R34
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM HYDRAULIC POWER 液压2(24)