• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-24 08:35来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 Figure 401/TASK 29-11-38-991-901
 1EFF :  ALL  1  29-11-38 Page 404 
1  1  Feb 01/98
 1  1
 1CES  1

 

 TASK 29-11-38-400-041
 Installation of the Engine 1 Pump Suction Self-Sealing Coupling (1672GK)
 WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
 WARNING : DO NOT TOUCH THE HYDRAULIC SYSTEM COMPONENTS FOR A SHORT TIME AFTER
_______ THE ENGINE IS SHUTDOWN. THE ENGINE COMPONENTS STAY HOT FOR SOME TIME AND CAN CAUSE INJURY.
 CAUTION : DO NOT LET HYDRAULIC FLUID FALL ON THE ENGINE. UNWANTED HYDRAULIC
_______ FLUID MUST BE REMOVED IMMEDIATELY WITH A CLEAN LINT FREE CLOTH. THE FLUID CAN CAUSE DAMAGE TO THE SURFACE PROTECTION AND TO SOME PARTS.
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific absorbent material
 No specific container
 No specific warning notice(s)
 No specific access platform 1.50 m (4 ft. 11 in.)
 No specific container 5 l (1.3208 USgal)
 No specific Torque Wrench : range 2.00 to 20.00 m.daN

 (15.00
 to 150.00 lbf.ft) No specific Torque Wrench : range 6.00 to 36.00 m.daN

 (50.00 to 260.00 lbf.ft)

 B.
 Referenced Information

 


 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-12-29-611-001 Fill the Hydraulic Fluid Reservoir with a Hand Pump 12-12-29-611-002 Fill the Hydraulic Fluid Reservoir with a Hydraulic
 Service Cart 29-11-00-710-001 Operational Test of the Green Hydraulic System 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs 29-14-00-614-002 Pressurization of the Hydraulic Reservoirs through
 the Ground Connector
 29-23-00-863-001  Pressurize the Green Hydraulic System from the Yellow Hydraulic System through the PTU with the Electric Pump
 29-23-00-864-001  Depressurize the Green and Yellow Hydraulic Systems
 after Operation of the PTU 29-11-38-991-901 Fig. 401 FOR FIN 1000EM1 71-13-00-010-040 Opening of the Fan Cowl Doors 71-13-00-410-040 Closing of the Fan Cowl Doors
 3. Job Set-up
__________
 Subtask 29-11-38-860-051
 A. Aircraft Maintenance Configuration
 (1)
 Make sure that the Green hydraulic system is depressurized (Ref. TASK 29-23-00-864-001).

 (2)
 Make sure that the Green hydraulic reservoir is depressurized (Ref. TASK 29-14-00-614-001).

 (3)
 Make sure that the warning notice(s) is (are) in position to tell persons not to pressurize the Green hydraulic system: - on the ground service panel 197CB.

 (4)
 Make sure that the warning notice(s) is (are) in position on the access door 195BB to tell persons not to pressurize the Green hydraulic reservoir.

 


 Subtask 29-11-38-941-052
 B. Safety Precautions
 (1)
 On the center pedestal, on the ENG panel 115VU:

 -make sure that warning notice(s) is (are) in position to tell persons not to start the engine.

 (2)
 Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.

 (3)
 Make sure that the warning notice(s) is (are) in position to tell persons not to pressurize the Green hydraulic system:

 -in the cockpit, on the HYD section of the overhead panel 40VU,

 (4)
 On the overhead maintenance panel 50VU:

 -make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.

 (5)
 Make sure that the warning notice(s) is (are) in position to tell persons not to energize the FADEC 1(2).

 (6)
 Make sure that a container is below the hydraulic tube connection to the switch to collect the remaining fluid.


 Subtask 29-11-38-865-051
 C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU HYDRAULIC/G HYD/PUMP ENG1/CTL 1701GK R35 121VU HYDRAULIC/G HYD/PUMP ENG1/MONG 1702GK R34
 Subtask 29-11-38-010-052
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM HYDRAULIC POWER 液压2(54)