Subtask 29-11-17-865-058 R B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1702GK Subtask 29-11-17-710-052 R C. Test
(1)
Do an operational test of the Green hydraulic system (Ref. TASK 29-11-00-710-001).
(2)
During the dry motoring, make sure that there are no leaks from the LP pressure switch of the pump.
(3)
Make sure that the level of hydraulic fluid in the Green reservoir is correct. If necessary, fill the reservoir (Ref. TASK 12-12-29-611-001).
5. Close-up
________
Subtask 29-11-17-860-057
A. Aircraft Maintenance Configuration
(1)
Remove the access platform(s).
(2)
Make sure that the work area is clean and clear of tool(s) and other items.
Subtask 29-11-17-942-052
B. Remove the safety precautions
(1)
Remove the warning notice(s).
Subtask 29-11-17-410-052
C.
Close Access
(1)
Close the left fan cowl door:
FOR 1000EM1
close the door 437AL (Ref. TASK 71-13-00-410-040)
(2)
Close the door 195BB.
PRESSURE GAGE - ACCUMULATOR AIR, GREEN POWER (1072GM) - REMOVAL/INSTALLATION
____________________________________________________________________________
TASK 29-11-21-000-001
Removal of the Accumulator-Air Pressure Gage (1072GM)
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific blanking plugs
No specific circuit breaker(s) safety clip(s)
No specific warning notices
No specific access platform 2.8 m (9 ft. 2 in.)
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
29-14-00-614-001 Depressurization of the Hydraulic Reservoirs
29-23-00-860-001 Disconnection of the Isolation Coupling of the Power
Transfer Unit (PTU)
32-12-00-010-001 Open the Main Gear Doors for Access
R **ON A/C 001-001, 051-052,
29-11-21-991-001 Fig. 401 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM HYDRAULIC POWER 液压2(32)