• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-21 14:12来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 -cracks
 -
signs of stress

 -
signs of damage.

 

 (4)
 Examine the WTB.


 (a) Use a flashlight and a mirror to examine the external surface of the WTB at the seal witness drains.
 (b) The area around the seal witness drains is permitted to be wet R with oil. But, if a drop of hydraulic fluid is found, replace the R WTB (Ref. TASK 27-51-51-000-001) (Ref. TASK 27-51-51-400-001).
 NOTE : The area near the seal witness drains, which is wet with
____
 oil, must be cleaned.

 

 5. Close-Up
________ Subtask 27-54-00-410-052
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Close the access doors:

 -
for the left wing, close 571AB, 573AB, 573BB, 573CB, 575AB, 575BB, 575CB, 575DB, 575EB, 575FB, 575GB

 -
for the right wing, close 671AB, 673AB, 673BB, 673CB, 675AB, 675BB, 675CB, 675DB, 675EB, 675FB, 675GB.

 


 (3) Close the MLG doors (Ref. TASK 32-12-00-410-001). Subtask 27-54-00-865-058
 B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 6CV, 8CV, 10CV, 12CV.
 Subtask 27-54-00-860-066
 C. Aircraft Configuration
 (1) Install the safety collar on the circuit breakers 10CV and 12CV. Subtask 27-54-00-942-057
 D. Removal of Equipment
 (1)
 Remove the safety barriers.

 (2)
 Remove the access platform(s).

 (3)
 Remove the warning notice(s).

 (4)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.


 1EFF : ALL 1 27-54-00Page 623 1 1 May 01/04R 1 1 1CES 1


R  **ON A/C 051-051, 
R  TASK 27-54-00-210-005 
R  Check Flap Attachment Bearing No 1 for Liner Migration 
R  WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU_______ 
R  START A TASK ON OR NEAR: 
R  - THE FLIGHT CONTROLS 
R  - THE FLIGHT CONTROL SURFACES 
R  - THE LANDING GEAR AND THE RELATED DOORS 
R  - COMPONENTS THAT MOVE. 
R  WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING_______ 
R  GEAR. 
R  CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:_______ 
R  - DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS. 
R  - DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS. 
R  - MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY. 
R  INCORRECT INSTALLATION CAN CAUSE DAMAGE. 
R  1. Reason for the Job__________________ 
R  Refer to the MPD TASK: 275100-06 
R  2. Job Set-up Information______________________ 
R  A. Fixtures, Tools, Test and Support Equipment 
R  -------------------------------------------------------------------------------
R  REFERENCE  QTY DESIGNATION 
R  -------------------------------------------------------------------------------
R  No specific  circuit breaker(s) safety clip(s) 
R  No specific  flashlight 
R  No specific  mirror 
R  No specific  safety barriers 
R  No specific  warning notice 
R  No specific  adjustable access platform 4.0 m (13 ft. 1 in.) 
R  98D27803000000  1 LOCKING TOOL - FLAP/SLAT CONTROL LEVER 

R 1EFF : 051-051, 1 27-54-00Page 624 1 1 May 01/05 1 1 1CES 1R B. Consumable Materials


R -------------------------------------------------------------------------------R REFERENCE DESIGNATION R -------------------------------------------------------------------------------
R  Material No. 11-002  USA MIL-PRF-680 
R  DRY CLEANING SOLVENT (VARSOL/WHITE SPIRIT) 
R  (Ref. 20-31-00) 
R  Material No. 19-003  USA AMS 3819 
R  LINT-FREE COTTON CLOTH (Ref. 20-31-00) 

R C. Referenced Information
R -------------------------------------------------------------------------------R REFERENCE DESIGNATION R -------------------------------------------------------------------------------
R 27-50-00-866-008 R 27-50-00-866-009 R 27-54-46-000-005 R R 27-54-46-400-003 R R 32-00-00-481-001 R R 27-54-00-991-033
R 3. Job Set-up
__________ Extension of the Flaps on the Ground Retraction of the Flaps on the Ground Removal of the Pendulum of the No. 1 Flap Track Carriage Installation of the Pendulum of the No. 1 Flap Track Carriage Installation of the Safety Devices on the Landing Gears Fig. 606
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FLIGHT CONTROLS 飞行操纵4(163)