PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
R  49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1 121VU FLIGHT CONTROLS/WTB/FLP/SYS2 121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2 122VU FLIGHT CONTROLS/WTB/FLP/SYS1  6CV 12CV 8CV 10CV  B07P20Q21S07
 4. Procedure_________
 (Ref. Fig. 402/TASK 27-51-51-991-002) 
R R R R R R  CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING_______ EDGE: - DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS. - DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS. - MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY. INCORRECT INSTALLATION CAN CAUSE DAMAGE.
 Subtask 27-51-51-420-057
 A. Preparation for Installation
 WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL_______ MATERIALS ONLY WITH A GOOD SUPPLY OF AIR. OBEY THE MANUFACTURERS INSTRUCTIONS. PUT ON PROTECTIVE CLOTHING. DO NOT GET THEM IN YOUR MOUTH. DO NOT SMOKE. DO NOT BREATHE THE GAS. THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT. GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
 (1) Clean the component interface and/or the adjacent area with a MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS (Material No. 11-004).

 

 (2)
 Clean the component interface and/or the adjacent area.

 (3)
 Do an inspection of the component interface and/or the adjacent area.

 (4)
 Make sure that the parts retained from the removed component are clean and in the correct condition.

 (5)
 Lubricate the new O-rings (1),(3),(5) and (6),and the back-up rings

 (2) and (4), with HYDRAULIC FLUIDS (Material No. 02-003).

 (6)
 Remove the blanking plugs from the solenoid valve (7) and the wing tip brake.


 Subtask 27-51-51-420-055
 B. Installation of the Solenoid Valve
 (1)
 Install the new O-ring (5) and the new O-ring (6) on the solenoid valve (7).

 (2)
 Install the new back-up ring (4) and the new O-ring (3) on the solenoid valve (7). Make sure that the curve on the face of the back-up ring (4) is against the O-ring (3).

 (3)
 Install the new back-up ring (2) and the new O-ring (1) on the solenoid valve (7). Make sure that the curve on the face of the back-up ring (2) is against the O-ring (1).

 (4)
 Install the solenoid valve (7) on the wing tip brake. NOTE : Solenoid valves 903A0000-01 removed from the PCU valve block

____ (Ref. 27-54-53 and 27-84-53) must not be installed on the wing-tip brake.

 (5)
 Install the screws (9).

 (6)
 TORQUE the screws (9) to between 0.25 and 0.27 m.daN (22.12 and 23.89 lbf.in).


 Subtask 27-51-51-860-054
 C. Aircraft Maintenance Configuration
 (1) Fill the applicable hydraulic reservoirs (Ref. TASK 12-12-29-611-001) (Ref. TASK 12-12-29-611-002):
 -
FOR 33CV fill the Yellow and the Blue hydraulic reservoirs

 -
FOR 34CV fill the Green and the Blue hydraulic reservoirs.


 1EFF : ALL 1 27-51-51Page 430 1 1 Aug 01/99R 1 1 1CES 1


 (2)
 Remove the LOCKING TOOL - FLAP/SLAT CONTROL LEVER from the flap/slat


 control lever.

 (3)
 Make sure that the work area is clean and clear of tool(s) and other items.


 Subtask 27-51-51-865-055
 D. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 6CV, 8CV, 10CV, 12CV.
 Subtask 27-51-51-863-052
 E. Aircraft Maintenance Configuration
 (1)
 Install the safety collar on the circuit breakers 10CV and 12CV.

 (2)
 Pressurize the applicable hydraulic reservoirs and systems:


 WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL
_______ SURFACES ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
 WARNING : MAKE SURE THAT THE CONTROLS AGREE WITH THE POSITION OF THE
_______ ITEMS THEY OPERATE BEFORE YOU PRESSURIZE A HYDRAULIC SYSTEM.
 (a) Pressurize the applicable hydraulic reservoirs (Ref. TASK 29-14-00-614-002):
 -
FOR 33CV pressurize the Yellow and the Blue hydraulic system reservoirs

 -
FOR 34CV pressurize the Green and the Blue hydraulic system reservoirs.


 (b) Pressurize the applicable hydraulic systems (Ref. TASK 29-10-00-863-001) (Ref. TASK 29-10-00-863-002) (Ref. TASK 29-10-00-863-003):
 -
FOR 33CV pressurize the Yellow and the Blue hydraulic systems
 