R **ON A/C ALL
Subtask 27-51-44-865-072
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 6CV, 8CV.
Subtask 27-51-44-710-054
D. Test
(1) Do an operational test of the failure detection sensors for the flap attachment (Ref. TASK 27-51-00-710-002).
5. Close-up
________
Subtask 27-51-44-410-056
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Install the upper and the lower kink-seals (Ref. TASK 27-54-61-400-006).
Subtask 27-51-44-942-055
B. Removal of Equipment
(1)
Remove the safety barriers.
(2)
Remove the warning notice(s).
(3)
Remove the ground support and maintenance equipment, the special and standard tools and all other items.
STRUT - INTERCONNECTING - ADJUSTMENT/TEST
_________________________________________
TASK 27-51-44-820-001
Adjustment of the Interconnecting Strut
1. Reason for the Job
__________________
To adjust the rigged position of the interconnecting strut when the strut has not been disconnected at either end.
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific safety barriers No specific warning notice No specific access platform 3.5 m (11 ft. 6 in.) No specific Torque Wrench : range 1.00 to 10.00 m.daN
(8.00 to 75.00 lbf.ft) 98D27504031000 1 PIN-SETTING 98D27803000000 1 LOCKING TOOL - FLAP/SLAT CONTROL LEVER
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
27-00-00-480-002 Installation of the Flap/Slat Control-Lever Locking
Tool (98D27803000000) 27-50-00-866-008 Extension of the Flaps on the Ground 27-50-00-866-009 Retraction of the Flaps on the Ground 27-51-00-820-003 To Do a Check of the Flap Rigged Position (With the
Sharks Fin) 27-54-00-710-001 Operational Test of the Flap System 27-54-61-000-002 Removal of the Flap Kink-Seals 27-54-61-400-006 Installation of the Flap Kink-Seals 31-32-00-860-006 Procedure to Get Access to the SYSTEM REPORT/TEST
F/CTL Page
1EFF : ALL 1 27-51-44Page 501 1 1 May 01/04R 1 1 1CES 1
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
27-51-44-991-005 Fig. 501
**ON A/C 301-399,
27-51-44-991-005-A Fig. 501A
**ON A/C ALL
3. Job Set-up
__________
Subtask 27-51-44-941-063
A. Safety Precautions
(1)
Make sure that the safety barriers are in position.
(2)
Make sure that the warning notice is in position to tell persons not to operate the flap/slat controls.
Subtask 27-51-44-860-064
B. Aircraft Maintenance Configuration
(1)
Make sure that the lower kink seal, the cushion seals and the upper kink seals are removed from the flaps (Ref. TASK 27-54-61-000-002).
(2)
Make sure that the flaps are extended to position 1 (Ref. TASK 27-50-00-866-008).