B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
27-51-34-991-001 Fig. 401
3. Job Set-up
__________
Subtask 27-51-34-865-050
A. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------FOR 21CV
49VU FLIGHT CONTROLS/SLT FLP/POS/IND 1 1CN B12 49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1 6CV B07 49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1 5CV B06
105VU ELEC/HOT BUS/701PP SPLY 5PB1 D01 R 105VU ELEC/HOT BUS/701PP SPLY 12PB1 E01 FOR 22CV 105VU ELEC/HOT BUS/702PP SPLY 5PB2 D02
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------105VU ELEC/HOT BUS/702PP SPLY 12PB2 E02 121VU FLIGHT CONTROLS/SLT FLP/POS/IND2 2CN P16 121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2 8CV Q21 121VU FLIGHT CONTROLS/SLT/CTL/SYS2 7CV R21
Subtask 27-51-34-010-050
B. Get Access
(1)
Put the access platform in position.
(2)
Open the access door 824.
4. Procedure
_________ (Ref. Fig. 401/TASK 27-51-34-991-001) Subtask 27-51-34-020-050
A. Removal of the SFCC
(1)
Loosen the knurled nuts (4).
(2)
Pull the SFCC (1) on its rack (3) to disconnect it from the electrical connectors (2).
(3)
Remove the SFCC (1) from its rack (3).
(4)
Put blanking caps on the disconnected electrical connectors (2).
1EFF : ALL 1 27-51-34Page 402 1 1 Aug 01/99R 1 1 1CES 1
Slat and Flap Control Computer (SFCC)
Figure 401/TASK 27-51-34-991-001
1EFF : ALL 1 27-51-34 Page 403
1 1 Feb 01/98
1 1
1CES 1
TASK 27-51-34-400-001
Installation of the SFCC (21CV,22CV)
1. Reason for the Job__________________
Self Explanatory
2. Job Set-up Information______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 1.6 m (5 ft. 3 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
R R R R 22-97-00-710-001 27-51-00-740-002 27-54-00-710-002 27-81-00-740-002 31-21-00-750-002 27-51-34-991-001 Operational Test of the LAND CAT III Capability Bite Test of the Slat and Flap Control Computers (Flap System)Operational Test of the Flap and Slat Systems Bite Test of the Slat and Flap Control Computers (Slat System)Procedure to set the ClockFig. 401
3. Job Set-up__________
Subtask 27-51-34-860-050
A. Aircraft Maintenance Configuration
(1) Make sure that the access platform is in position.
(2) Make sure that the access door 824 is open.
Subtask 27-51-34-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------FOR 21CV
49VU FLIGHT CONTROLS/SLT FLP/POS/IND 1 1CN B12 49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1 6CV B07 49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1 5CV B06 105VU ELEC/HOT BUS/701PP SPLY 5PB1 D01 R 105VU ELEC/HOT BUS/701PP SPLY 12PB1 E01
FOR 22CV 105VU ELEC/HOT BUS/702PP SPLY 5PB2 D02 105VU ELEC/HOT BUS/702PP SPLY 12PB2 E02 121VU FLIGHT CONTROLS/SLT FLP/POS/IND2 2CN P16 121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2 8CV Q21 121VU FLIGHT CONTROLS/SLT/CTL/SYS2 7CV R21
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FLIGHT CONTROLS 飞行操纵4(101)