• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-02-11 09:46来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 NOTE : You must do the inspection of the landing gear which has gone off

____
 the runway.
 This inpection contains four inspection procedures;
 To know which inspections to do, you must know if:

 -
the landing gear wheels sank into the ground


 -
the landing gear found an obstacle on its path.
 When you know this information, go directly to the necessary
 inspections.

 

 -------------------------------------------------------------------------------|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.| | |CODE| |  1  |  2  |  3  |SIGN|FIG.| |----|----|---------------------------------------|-----|-----|-----|----|----| | | | | | | | | | |1. | | Inspection of the NLG after the air-| | | | | | | | | craft goes off the runway and the NLG | | | | | | | | | wheels sank into the ground and/or the| | | | | | | | | NLG found an obstacle on its path. | | | | | | | | | | | | | | | | A.| | Initial Inspection | | | | | | | | | | | | | | | | | | (1) Lift the aircraft at forward |  X  | | | | | | | | jacking point: | | | | | | | | | (Ref. TASK 07-11-00-581-003) | | | | | | | | | - make sure that extension of the |  X  | | | | | | | | shock absorber is smooth and | | | | | | | | | full. | | | | | | | | | - examine the sliding rod (the |  X  | | | | | | | | part you can see) for blue | | | | | | | | | color, signs of bronze or chrome| | | | | | | | | damage. | | | | | | | | | (2) Do a check of the pressure in the |  X  | | | | | | | | NLG shock absorber. | | | | | | | | | (Ref. TASK 12-14-32-614-004) | | | | | |
 1EFF : ALL 1 05-51-24Page 607 1 1 May 01/05R 1 1 1CES 1


 -------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
 | |CODE| |  1  |  2  |  3  |SIGN|FIG.|
 |----|----|---------------------------------------|-----|-----|-----|----|----|

 |  |  | (3) Examine the shock absorber for  |  X  |  |  |  |  |
 |  |  |  external oil leakage.  |  |  |  |  |  |
 |  |  | (4) Do the inspection of the NLG  |  X  |  |  |  |  |
 |  |  |  (Ref. TASK 32-21-00-200-005) for: |  |  |  |  |  |
 |  |  |  - out-of-roundness of the shock  |  |  |  |  |  |
 |  |  |  absorber sliding-rod.  |  |  |  |  |  |
 |  |  |  - cracks, damaged paintwork and  |  |  |  |  |  |
 |  |  |  deformation on the steering ac- |  |  |  |  |  |
 |  |  |  tuator body (measure the bottom |  |  |  |  |  |
 |  |  |  of actuator body).  |  |  |  |  |  |
 |  |  |  - free rotation of the rotating  |  |  |  |  |  |
 |  |  |  tube.  |  |  |  |  |  |
 |  |  | (5) Do the functional test of the  |  X  |  |  |  |  |
 |  |  |  Extension/Retraction of the NLG  |  |  |  |  |  |
 |  |  |  (REF. TASK 32-31-00-720-003).  |  |  |  |  |  |
 |  |  |  |  |  |  |  |  |
 |  B.|  | Subsequent Inspection  |  |  |  |  |  |
 |  |  |  |  |  |  |  |  |
 |  |  | (1) If the initial inspection shows no|  |  |  |  |  |
 |  |  |  unsatisfactory condition:  |  |  |  |  |  |
 |  |  |  (a) Do the inspection given in  |  X  |  |  |  |  |
 |  |  |  item 2. (inspection of the  |  |  |  |  |  |
 |  |  |  NLG after the aircraft goes  |  |  |  |  |  |
 |  |  |  off the runway but the NLG  |  |  |  |  |  |
 |  |  |  wheels did not sink into the  |  |  |  |  |  |
 |  |  |  ground and the NLG did not  |  |  |  |  |  |
 |  |  |  find an obstacle on its path).|  |  |  |  |  |
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 时间限制/维护检查 2(81)