1EFF : ALL 1 05-51-11Page 649 1 1 May 01/04R 1 1 1CES 1
(Ref. TASK 32-21-13-400-001) (Ref. TASK 32-21-00-200-006)
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | |Inspection of the nose landing gear | | | | | |
| | |NOTE: You can do this inspection with | | | | | |
| | | the aircraft on its wheels or on | | | | | |
| | | jacks. | | | | | |
R | | | However, if the crew makes a | | | | | |
R | | | report a report of a hight pitch | | | | | |
R | | | rate AIRBUS recommends to lift | | | | | |
R | | | the aircraft at the nose | | | | | |
R | | | jacking point to do a check of | | | | | |
R | | | the shock absorber extension. | | | | | |
| | | | | | | | |
| A.| |Do a check of the pressure in the shock| X | | | | |
| | |absorber | | | | | |
| | |(Ref. TASK 12-14-32-614-004) | | | | | |
| | |If you find unsatisfactory condition: | | | | | |
| | |(1) Remove the shock absorber for | | X | | | |
| | | overhaul | | | | | |
| | | (Ref. TASK 32-21-13-000-001) | | | | | |
| | | | | | | | |
| B.| |Do a visual inspection of the wheels | X | | | | |
| | |for distortion, cracks and damaged | | | | | |
| | |paintwork. | | | | | |
| | |If you find damage: | | | | | |
| | |(1) Remove the wheels | | X | | | |
| | | (Ref. TASK 32-41-12-000-001) | | | | | |
| | |(2) Remove the axle sleeve | | X | | | |
| | | (Ref. TASK 32-41-12-000-002) | | | | | |
| | |(3) Do a visual inspection of the axle | | X | | | |
| | | and sleeve for damage. | | | | | |
| | | If you find damage: | | | | | |
| | | (a) Remove the NLG for overhaul | | | X | | |
| | | (Ref. TASK 32-21-11-000-002) | | | | | |
| | | | | | | | |
| C.| |Examine: | X | | | | |
| | |- the nose landing gear and all the | | | | | |
| | | components installed on it for | | | | | |
| | | cracks, scores, tears, rupture, | | | | | |
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 时间限制/维护检查 2(3)