1EFF : ALL 1 05-51-41Page 604 1 1 Nov 01/00R 1 1 1CES 1
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.| | |CODE| | 1 | 2 | 3 |SIGN|FIG.| |----|----|---------------------------------------|-----|-----|-----|----|----| | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | |----|----|---------------------------------------|-----|-----|-----|----|----|
| | | if you find damage: | | | | | |
| | | - tell Airbus Industrie about | | | X | | |
| | | the results. | | | | | |
| | | (6)Examine the NLG actuating cylinder | X | | | | |
| | | and its attachment fittings for | | | | | |
| | | distortion, cracks, pulled or | | | | | |
| | | torn fasteners and damaged | | | | | |
| | | paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | (a)Remove the actuating cylinder | | X | | | |
| | | for strip-down inspection | | | | | |
| | | (Ref. TASK 32-31-22-000-01) | | | | | |
| | | (refer to the manufacturer's | | | | | |
| | | instructions for the strip-down | | | | | |
| | | inspection). | | | | | |
| | | (b)On the aircraft, continue the | | X | | | |
| | | inspection of the attachment | | | | | |
| | | fittings and the gear well (all | | | | | |
| | | the items you can see) for | | | | | |
| | | distortion, pulled or torn | | | | | |
| | | fasteners and damaged paintwork.| | | | | |
| | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about | | | X | | |
| | | the results. | | | | | |
| | | (7)If you removed components, install | | | | | |
| | | serviceable components: | | | | | |
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 时间限制/维护检查 2(135)