• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-02-11 09:46来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 |  |  | (b)On the aircraft, inspect the  | |  X  |  |  |  |
 |  |  | attachment fitting for  | | |  |  |  |
 |  |  | damage.  | | |  |  |  |
 |  |  | If you find damage:  | | |  |  |  |
 |  |  | - tell Airbus Industrie about  | | |  X  |  |  |
 |  |  | the results.  | | |  |  |  |
 |  |  | (5)Examine the lockstay assembly for  |  X  | |  |  |  |
 |  |  | distortion, cracks and damaged  | | |  |  |  |
 |  |  | paintwork:  | | |  |  |  |
 |  |  | If you find damage:  | | |  |  |  |
 |  |  | (a)Remove the lockstay assembly  | |  X  |  |  |  |
 |  |  | for overhaul.  | | |  |  |  |
 |  |  | (Ref. TASK 32-21-17-000-001)  | | |  |  |  |
 |  |  | (refer to the manufacturer's  | | |  |  |  |
 |  |  | instructions for the overhaul  | | |  |  |  |
 |  |  | procedure).  | | |  |  |  |
 |  |  | (b)On the aircraft, inspect the  | |  X  |  |  |  |
 |  |  | attachment fittings for damage  | | |  |  |  |

 1EFF : ALL 1 05-51-41Page 604 1 1 Nov 01/00R 1 1 1CES 1


 -------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.| | |CODE| |  1  |  2  |  3  |SIGN|FIG.| |----|----|---------------------------------------|-----|-----|-----|----|----| | 1  | 2  | 3 |  4  |  5  |  6  |  7 | 8 | |----|----|---------------------------------------|-----|-----|-----|----|----|
 |  |  |  if you find damage:  |  |  |  |  |  |
 |  |  |  - tell Airbus Industrie about  |  |  |  X  |  |  |
 |  |  |  the results.  |  |  |  |  |  |
 |  |  | (6)Examine the NLG actuating cylinder |  X  |  |  |  |  |
 |  |  |  and its attachment fittings for  |  |  |  |  |  |
 |  |  |  distortion, cracks, pulled or  |  |  |  |  |  |
 |  |  |  torn fasteners and damaged  |  |  |  |  |  |
 |  |  |  paintwork.  |  |  |  |  |  |
 |  |  |  If you find damage:  |  |  |  |  |  |
 |  |  |  (a)Remove the actuating cylinder  |  |  X  |  |  |  |
 |  |  |  for strip-down inspection  |  |  |  |  |  |
 |  |  |  (Ref. TASK 32-31-22-000-01)  |  |  |  |  |  |
 |  |  |  (refer to the manufacturer's  |  |  |  |  |  |
 |  |  |  instructions for the strip-down |  |  |  |  |  |
 |  |  |  inspection).  |  |  |  |  |  |
 |  |  |  (b)On the aircraft, continue the  |  |  X  |  |  |  |
 |  |  |  inspection of the attachment  |  |  |  |  |  |
 |  |  |  fittings and the gear well (all |  |  |  |  |  |
 |  |  |  the items you can see) for  |  |  |  |  |  |
 |  |  |  distortion, pulled or torn  |  |  |  |  |  |
 |  |  |  fasteners and damaged paintwork.|  |  |  |  |  |
 |  |  |  If you find damage:  |  |  |  |  |  |
 |  |  |  - tell Airbus Industrie about  |  |  |  X  |  |  |
 |  |  |  the results.  |  |  |  |  |  |
 |  |  | (7)If you removed components, install |  |  |  |  |  |
 |  |  |  serviceable components:  |  |  |  |  |  |
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 时间限制/维护检查 2(135)