-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | their attachments | | | | | |
| | | at the horizontal stabilizer | | | | | |
| | | rear-spar and at the elevator | | | | | |
| | | front spar. | | | | | |
| | | | | | | | |
| C.| | Flaps | | | | | |
| | | | | | | | |
| | | (1) Do a general visual inspection of | X | | | | |
| | | each control surface and its | | | | | |
| | | attachments for distortion and | | | | | |
| | | damage. | | | | | |
| | | | | | | | |
| | | (2) Do a visual inspection of: | X | | | | |
| | | - the flap track fairings, | | | | | |
| | | - the pylon aft movable-fairings | | | | | |
| | | and their attachments | | | | | |
| | | for distortion and damage. | | | | | |
| | | | | | | | |
| | | (1) Examine the external surface and | X | | | | |
| | | the attachments of each control | | | | | |
| | | surface for distortion and damage.| | | | | |
| | | | | | | | |
|2. | | Operational Test of the Flight Control| | | | | |
| | | Surfaces | | | | | |
| | | | | | | | |
| A.| | Make sure that the work area is clean | X | | | | |
| | | and clear of tool(s) and other items. | | | | | |
| | | | | | | | |
| B.| | Do an operational test of each control| X | | | | |
| | | surface and make sure that the related| | | | | |
| | | surface(s) move(s) smoothly and freely| | | | | |
| | | | | | | | |
| | | (1) For the rudder: | | | | | |
| | | (Ref. TASK 27-24-00-710-001) | | | | | |
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 时间限制/维护检查 2(140)