- repair the above wiring.
(b) If there is continuity:
- replace the ANTENNA-LOCALIZER 1/2 (3RT) (Ref. AMM TASK 34-36-11-000-001) and (Ref. AMM TASK 34-36-11-400-001).
C. If the LOC indication does not come into view on the two PFDs and the two NDs during the test:
- replace the ANTENNA-LOCALIZER 1/2 (3RT) (Ref. AMM TASK 34-36-11-000-001) and (Ref. AMM TASK 34-36-11-400-001).
D. Do the test given in Para. 3.
BITE Test of the ILS 1 Inoperative
1. Possible Causes
_______________
- RECEIVER-ILS, 1 (2RT1)
- LGCIU-1 (5GA1)
- wiring of the GROUND/AIR discrete from the ILS receiver 1 (2RT1) to the LGCIU 1 (5GA1)
2. Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
AMM 32-31-71-000-001 Removal of the LGCIU (5GA1, 5GA2)
AMM 32-31-71-400-001 Installation of the LGCIU (5GA1, 5GA2)
AMM 34-36-00-740-002 BITE Test of the ILS
AMM 34-36-31-000-001 Removal of the ILS Receiver (2RT1,2RT2)
AMM 34-36-31-400-001 Installation of the ILS Receiver (2RT1,2RT2)
ASM 34-36/01
3. Fault Confirmation
__________________
A. Test
(1) Not applicable, the fault is evident.
4. Fault Isolation
_______________
A. If you cannot start the BITE test of the ILS 1 on the MCDU:
- replace the RECEIVER-ILS, 1 (2RT1) (Ref. AMM TASK 34-36-31-000-001) and (Ref. AMM TASK 34-36-31-400-001).
(1) If the fault continues:
- replace the LGCIU-1 (5GA1) (Ref. AMM TASK 32-31-71-000-001) and (Ref. AMM TASK 32-31-71-400-001).
(2) If the fault continues:
- do a check and repair the wiring of the GROUND/AIR discrete from the ILS receiver 1 (2RT1) to the LGCIU 1 (5GA1) (Ref. ASM 34-36/01).
B. Do the BITE test of the ILS (Ref. AMM TASK 34-36-00-740-002).
「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞34-36-00∞∞∞∞∞∞∞∞∞∞Page 248
May 01/05R CES
BITE Test of the ILS 2 Inoperative
1. Possible Causes
_______________
- RECEIVER-ILS, 2 (2RT2)
- LGCIU-2 (5GA2)
- wiring of the GROUND/AIR discrete from the ILS receiver 2 (2RT2) to the LGCIU 2 (5GA2)
2. Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
AMM 32-31-71-000-001 Removal of the LGCIU (5GA1, 5GA2)
AMM 32-31-71-400-001 Installation of the LGCIU (5GA1, 5GA2)
AMM 34-36-00-740-002 BITE Test of the ILS
AMM 34-36-31-000-001 Removal of the ILS Receiver (2RT1,2RT2)
AMM 34-36-31-400-001 Installation of the ILS Receiver (2RT1,2RT2)
ASM 34-36/01
3. Fault Confirmation
__________________
A. Test
(1) Not applicable, the fault is evident.
4. Fault Isolation
_______________
A. If you cannot start the BITE test of the ILS 2 on the MCDU:
- replace the RECEIVER-ILS, 2 (2RT2) (Ref. AMM TASK 34-36-31-000-001) and (Ref. AMM TASK 34-36-31-400-001).
(1) If the fault continues:
- replace the LGCIU-2 (5GA2) (Ref. AMM TASK 32-31-71-000-001) and (Ref. AMM TASK 32-31-71-400-001).
(2) If the fault continues:
- do a check and repair the wiring of the GROUND/AIR discrete from the ILS receiver 2 (2RT2) to the LGCIU 2 (5GA2) (Ref. ASM 34-36/01).
B. Do the BITE test of the ILS (Ref. AMM TASK 34-36-00-740-002).
「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞34-36-00∞∞∞∞∞∞∞∞∞∞Page 249
May 01/05R CES
R **ON A/C 001-004, 051-060,
TASK 34-36-00-810-826
Loss of the CFDIU INPUT Bus on the ILS 1
1. Possible Causes
_______________
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320 Trouble Shooting Manual 排故手册 导航 NAVIGATION 2(113)