• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-24 08:55来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者


 Subtask 30-21-51-865-052
R C. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------122VU ANTI ICE/ENG/2 1DN2 W10 122VU ANTI ICE/ENG/1 1DN1 X10
 Subtask 30-21-51-010-051
R  D. Open the fan cowl doors (Ref. TASK 71-13-00-010-040): FOR 1000EM1 437AL, 438AR FOR 1000EM2 447AL, 448AR
 4. Procedure
_________
 (Ref. Fig. 401/TASK 30-21-51-991-300)
 Subtask 30-21-51-020-051

 A. Removal of the Engine Air Intake Anti-ice Valve
 (1)
 Disconnect the electrical connector 4000DN-A from the anti-ice valve (15).

 (2)
 Disconnect the muscle pressure hose (20) from the anti-ice valve (15).


 NOTE : Use a second wrench to hold the union on the anti-ice valve
____ when you loosen the hose coupling nut.
 (3)
 Remove the couplings (10) and seals (5) that connect the valve (15) to the ducts.

 (4)
 Remove the anti-ice valve (15) from the engine.

 (5)
 Put blanking plugs on the forward duct and air intake cowl anti-ice duct.

 (6)
 Put blanking plugs on the two open ends of the anti-ice valve (15).

 (7)
 Put protective covers on the electrical connectors on the harness and on the valve.

 (8)
 Put protective covers on the muscle pressure hose coupling and the union on the valve.

 


 Engine Air Intake Anti-ice Valve (4000DN)
 Figure 401/TASK 30-21-51-991-300
 1EFF :  ALL  1  30-21-51 Page 403 
1  1  Feb 01/98
 1  1
 1CES  1

 


 TASK 30-21-51-400-042


 Installation of the Engine Air Intake Anti-ice Valve (4000DN)
 1. Reason for the Job
__________________
 NOTE : The installation of the air intake anti-ice valve is the same for the
____
 engine 1 and the engine 2.

 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
R  No specific circuit breaker(s) safety clip(s) No specific fiber hammer No specific warning notice No specific Torque Wrench : range 36.00 to 220.00 lbf.in
 (0.40 to 2.60 m.daN)
 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. CP3010 * dry developer (Ref. 70-30-00) Material No. CP8004 * lockwire 0.032 in. (0.80 mm) dia. (Ref. 70-30-00) Material No. 08-061 USA MIL-T-4053 TAPE SOUND DAMPENINGALUMINIUM FOIL (Ref. 20-31-00)
 C. Expendable Parts
 -------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
E-seals  30-21-51 01A-020 D. Referenced Information


 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
R  24-41-00-861-002 

R  24-41-00-862-002 

R  24-42-00-861-001 

R  24-42-00-862-001 

30-21-51-210-040 
R  31-60-00-860-001 
R  31-60-00-860-002 
R  71-00-00-710-003 
R  71-00-00-710-004 
R  71-00-00-710-028 
71-13-00-010-040 
71-13-00-410-040 
30-21-51-991-300 
30-21-51-991-301 
30-21-51-991-302 
3. Job Set-up__________
 Subtask 30-21-51-865-053

Energize the Aircraft Electrical Circuits from the External Power De-energize the Aircraft Electrical Circuits Supplied from the External Power Energize the Ground Service Network from the External Power De-energize the Ground Service Network Supplied from the External PowerInspection/Check of the Seal of the Engine Air-Intake Anti-Ice Valve (4000DN) EIS Start Procedure EIS Stop Procedure Engine Automatic Start Engine Manual Start Engine ShutdownOpening of the Fan Cowl DoorsClosing of the Fan Cowl DoorsFig. 401Fig. 402Fig. 403
 A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM ICE AND RAIN PROTECTION 防冰和排雨1(83)