R 1EFF : 061-061, 1 30-21-49Page 413 1 1 May 01/05 1 1 1CES 1R **ON A/C ALL
TASK 30-21-49-400-043
Installation of the Muscle Pressure Tubes and Hoses
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific warning notice
No specific access platform 0.5 m (1 ft. 8 in.)
R No specific Torque Wrench : range 5.00 to 35.00 lbf.in
R (0.05 to 0.40 m.daN) No specific Torque Wrench : range 36.00 to 220.00 lbf.in
(0.40 to 2.60 m.daN)
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
Material No. CP2208 *
Scotch 3M-361 Tape (Ref. 70-30-00)
C. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from
the External Power
71-13-00-010-040 Opening of the Fan Cowl Doors
71-13-00-410-040 Closing of the Fan Cowl Doors
78-30-00-081-041 Make the Thrust Reverser Serviceable after
Maintenance
78-30-00-481-041 Make the Thrust Reverser Unserviceable for
Maintenance
78-36-00-010-040 Opening of the Thrust Reverser Doors
78-36-00-410-040 Closing of the Thrust Reverser Doors
R **ON A/C 001-049, 051-060, 062-099, 101-149, 151-199, 201-299, 301-399, R 401-499,
30-21-49-991-300 Fig. 401
**ON A/C 061-061,
30-21-49-991-300-A Fig. 401A
**ON A/C ALL
3. Job Set-up
__________
Subtask 30-21-49-860-050
A. Aircraft Maintenance Configuration
(1)
Make sure that the ground service network is energized (Ref. TASK 24-42-00-861-001).
(2)
On the center pedestal, on the ENG panel 115VU, make sure that a warning notice is in position to tell persons not to start the engine.
(3)
On the overhead maintenance panel 50VU, make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off. Make sure that a warning notice is in position to tell persons not to energize the FADEC 1(2).
(4)
Make sure that the access platform is in position.
Subtask 30-21-49-010-057
B. Get Access
(1)
Make sure that the fan cowl doors are open (Ref. TASK 71-13-00-010-040): FOR 1000EM1 437AL, 438AR FOR 1000EM2 447AL, 448AR
(2)
Make sure that the thrust reverser doors are open (Ref. TASK 78-36-00-010-040): FOR 1000EM1 451AL, 452AR FOR 1000EM2 461AL, 462AR
Subtask 30-21-49-040-052
C. Make sure that the thrust reverser is unserviceable (Ref. TASK 78-30-00-481-041).
Subtask 30-21-49-865-053
D. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------122VU ANTI ICE/ENG/2 1DN2 W10 122VU ANTI ICE/ENG/1 1DN1 X10
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM ICE AND RAIN PROTECTION 防冰和排雨1(66)