 WING ICE PROTECTION - ADJUSTMENT/TEST
_____________________________________
 TASK 30-11-00-710-001
 Operational Test of the Wing Ice-Protection System
 WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______ START A TASK ON OR NEAR:
 -
THE FLIGHT CONTROLS

 -
THE FLIGHT CONTROL SURFACES

 -
THE LANDING GEAR AND THE RELATED DOORS


 -COMPONENTS THAT MOVE.
 WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______ GEAR.
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific safety barriers No specific warning notices No specific Ground Air Power Cart 98D27803500001 1 TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
 from the External Power 31-60-00-860-001 EIS Start Procedure 31-60-00-860-002 EIS Stop Procedure 32-00-00-481-001 Installation of the Safety Devices on the Landing
 Gears
 1EFF : ALL 1 30-11-00Page 501 1 1 Nov 01/04R 1 1 1CES 1


 -------------------------------------------------------------------------------
REFERENCE DESIGNATION -------------------------------------------------------------------------------
49-00-00-710-008  Operational Test of the APU (APS 3200)
 49-00-00-710-010  Operational Test of the APU (131-9(A))
 71-00-00-710-003  Engine Automatic Start
 TSM 21 PB 101
 30-11-00-991-001  Fig. 501
 3. Job Set-up__________
 Subtask 30-11-00-941-067
 A. Safety Precautions

 (1) Put the safety barriers in position.
 (2) Make sure that the ground safety locks are installed on the landing gear (Ref. TASK 32-00-00-481-001).
R  (3) Put warning notices in the cockpit to tell persons not to operate the slats and the pneumatic systems. 
Subtask 30-11-00-860-059-B
 B. Aircraft Maintenance Configuration 
R R  (1) Install the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER (98D27803500001) on the slat/flap control lever.
 (2) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).
R R R R  NOTE : You can do the Operational Test of the Wing Ice-Protection____ System with a bleed air supply from one of these sources: - one engine - the Ground Air Power Cart (GAPC) - the APS 3200 APU or 131-9(A) APU. 
R R R  NOTE : Do not use the GTCP 36-300 APU bleed air supply to do the____ test. The GTCP 36-300 APU bleed air system does not supply sufficient pressure for the test procedure.

 

 NOTE : Access to the wing anti-ice system on the CFDS is through the____ TEMP CTL of the air-conditioning class 3 faults (Ref. TSM 21 PB 101).
 (3) Do the EIS start procedure (ECAM only) (Ref. TASK 31-60-00-860-001). 
R R (4) On the ECAM control panel (CP), push (in) the BLEED P/BSW. 
(5) If the source of power is the aircraft engines:
 (a) Operate Engine 1 or Engine 2 (Ref. TASK 71-00-00-710-003).
 NOTE : The operational test does not continue satisfactorily with____ the two Engines in operation. 
R R R (b) On the AIR COND panel 30VU, put the X BLEED switch in the OPEN position. 
(c) Make sure that the bleed air pressure is between 2.8 bar (40.6105 psi) and 3.2 bar (46.4120 psi). 
R  (6) If the source of power is the Ground Air Power Cart (GAPC):
 (a) On the AIR COND panel 30VU: - release (out) the PACK 1 and PACK 2 P/BSW's - make sure that the OFF lights are on. 
R  (b) Open the access panel 191DB. 
R  (c) Connect the GAPC to the HP connection. 
R  (d) Operate the GAPC to give a bleed air supply. 
R R  (e) On the AIR COND panel 30VU, put the X BLEED switch in the OPEN position. 
R R R  (f) Make sure that the bleed air pressure is between 2.8 bar (40.6105 psi) and 3.2 bar (46.4120 psi). 
 