(2)
For the anti-ice valve 9DL, make sure that the access panel 522WB has been removed.
(3)
For the anti-ice valve 10DL, make sure that the access panel 622WB has been removed.
Subtask 30-11-51-865-055
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1 5CV B06 49VU ANTI ICE/WING/CTL 2DL C02 49VU ANTI ICE/WING/MONG 1DL C01
121VU FLIGHT CONTROLS/SLT/CTL/SYS2 7CV R21
4. Procedure
_________
Subtask 30-11-51-420-052
A. Preparation for Installation
(1)
Clean the component interface and/or the adjacent area with a MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS (Material No. 11-026).
(2)
Make sure that the parts retained from the removed component are clean and in the correct condition.
(3) Do an inspection of the component interface and/or the adjacent area. R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
Subtask 30-11-51-420-051
B. Installation of the Anti-ice Valve Filter
(1)
Remove the blanking cap from the anti-ice control valve.
(2)
Lubricate the new O-ring (3) and the new O-ring (5) with LUBRICANTS (Material No. 06-012).
(3)
Install the new O-ring (5) on the filter (4).
(4)
Install the filter (4) into the anti-ice control valve.
(5)
Install the new O-ring (3) on the cap (2).
(6)
Install the cap (2) and the cap (1).
(7) Safety the caps (1) and (2) with MISCELLANEOUS (Material No. 19-010).
R **ON A/C 301-399,
R Subtask 30-11-51-420-051-A
R B. Installation of the Anti-ice Valve Filter
R (1) Remove the blanking plug from the anti-ice control valve.
R R (2) Use LUBRICANTS (Material No. 06-012) to lubricate the new O-ring (1) and the new O-ring (2).
R (3) Install the new O-ring (1) and the new O-ring (2) on the filter.
R (4) Install and tighten the filter (3).
R (5) Install and tighten the blanking cap (4).
R **ON A/C ALL
5. Close-up________
Subtask 30-11-51-410-051
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other items.
(2) For the anti-ice valve 9DL, install the access panel 522WB.
(3) For the anti-ice valve 10DL, install the access panel 622WB.
Subtask 30-11-51-865-054
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 5CV, 7CV, 2DL, 1DL.
Subtask 30-11-51-942-051
C. Removal of Equipment
(1)
Remove the safety barriers.
(2)
Remove the warning notice(s).
(3)
Remove the access platform(s).
(4)
Remove the ground support and maintenance equipment, the special and standard tools and all other items.
TASK 30-11-51-960-001 Replacement of the Wing Anti-Ice Valve Filter WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______ START A TASK ON OR NEAR:
-
THE FLIGHT CONTROLS
-
THE FLIGHT CONTROL SURFACES
-
THE LANDING GEAR AND THE RELATED DOORS
-COMPONENTS THAT MOVE. WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______ GEAR.
WARNING : MAKE SURE THAT THE PNEUMATIC SYSTEM IS DEPRESSURIZED BEFORE YOU START
_______ WORK ON THE PNEUMATIC SYSTEM.
WARNING : DO NOT TOUCH THE ANTI-ICE DUCTS UNTIL THEY ARE COOL. THE TEMPERATURE
_______ OF THE DUCTS STAYS HIGH FOR SOME TIME AFTER THE ENGINE STOPS.
1.
Reason for the Job
__________________
Refer to the MPD TASK: 301151-01
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s) No specific safety barriers No specific warning notice No specific warning notices