Aug 01/05
R
CES C. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
11-00-00-400-007 Installation of the ESSO (Scotchcal Labels)
24-42-00-861-001 Energize the Ground Service Network from the External
Power
24-42-00-862-001 De-energize the Ground Service Network Supplied from
the External Power
25-00-00-340-004 Filler Repair Method (Damage not Through) - All Cargo
Compartment Linings with Honeycomb Core
25-54-11-000-001 Removal of the FWD Cargo-Compartment Partition FR24
25-54-11-400-001 Installation of the FWD Cargo-Compartment Partition
FR24
25-54-12-000-001 Removal of the FWD Cargo Compartment Partition FR34
25-54-12-000-002 Removal of the Ceiling Panels in the FWD Cargo
Compartment
25-54-12-000-003 Removal of the Sidewall Panels in the FWD Cargo
Compartment
25-54-12-400-001 Installation of the FWD Cargo Compartment Partition
FR34
25-54-12-400-002 Installation of the Ceiling Panels in the FWD Cargo
Compartment
25-54-12-400-003 Installation of the Sidewall Panels in the FWD Cargo
Compartment
25-55-11-000-001 Removal of the AFT Cargo-Compartment Partition FR47
25-55-11-000-002 Removal of the Ceiling Panels in the AFT Cargo
Compartment - FR47/FR59
25-55-11-000-003 Removal of the Sidewall Panels in the AFT Cargo
Compartment - FR47/FR59
25-55-11-400-001 Installation of the AFT Cargo-Compartment Partition
FR47
25-55-11-400-002 Installation of the Ceiling Panels in the AFT Cargo
Compartment -FR47/FR59
25-55-11-400-003 Installation of the Sidewall Panels in the AFT Cargo
Compartment - FR47/FR59
25-55-12-000-001 Removal of the AFT Cargo Compartment Partition FR65
25-55-12-000-002 Removal of the Ceiling Panels in the AFT Cargo
Compartment - FR59/FR65
25-55-12-000-003 Removal of the Sidewall Panels in the AFT Cargo
Compartment - FR59/FR65
25-55-12-400-001 Installation of the AFT Cargo Compartment Partition
FR65
25-55-12-400-002 Installation of the Ceiling Panels in the AFT Cargo
Compartment - FR59/FR65
EFF : ALL 25-00-00Page A878
Aug 01/05
R
CES -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
25-55-12-400-003 Installation of the Sidewall Panels in the AFT Cargo Compartment - FR59/FR65 52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump 52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump AMM 11-35-25 P.Block 001 AMM 11-36-25 P.Block 001 25-00-00-991-011 Fig. 835 25-00-00-991-049 Fig. 836
3. Job Set-up
__________
Subtask 25-00-00-861-088
A. Energize the ground service network
(Ref. TASK 24-42-00-861-001).
Subtask 25-00-00-010-096
B. Get Access
(1)
Open the related cargo compartment door (Ref. TASK 52-30-00-860-001).
(2)
Put the ACCESS PLATFORM 2M (6 FT) in position.
Subtask 25-00-00-020-086
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备1(89)