• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-21 08:20来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific 1 ACCESS PLATFORM 2M (6 FT) No specific 2 ROLLER - RUBBER No specific 1 SCRAPER - NON METALLIC
 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
No specific S-Glass layer assembly D2557651900200 No specific S-Glass layer D2557651900000 Material No. 08-001 USA DOD-A-82720
 GENERAL PURPOSE ADHESIVE HONEYCOMB FILLER (Ref. 20-31-00) Material No. 08-060 USA MIL-T-4053 TAPE, PRESSURE SENSITIVE,GLASSCLOTH (Ref. 20-31-00) Material No. 11-010 USA TT-I-735 GRADE A ISOPROPYL ALCOHOL (Ref. 20-31-00) Material No. 19-003 USA AMS 3819 LINT-FREE COTTON CLOTH (Ref. 20-31-00)
 EFF : ALL 25-00-00Page A877

Aug 01/05
R
 CES  C. Referenced Information


 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
11-00-00-400-007  Installation of the ESSO (Scotchcal Labels)
 24-42-00-861-001  Energize the Ground Service Network from the External
 Power
 24-42-00-862-001  De-energize the Ground Service Network Supplied from
 the External Power
 25-00-00-340-004  Filler Repair Method (Damage not Through) - All Cargo
 Compartment Linings with Honeycomb Core
 25-54-11-000-001  Removal of the FWD Cargo-Compartment Partition FR24
 25-54-11-400-001  Installation of the FWD Cargo-Compartment Partition
 FR24
 25-54-12-000-001  Removal of the FWD Cargo Compartment Partition FR34
 25-54-12-000-002  Removal of the Ceiling Panels in the FWD Cargo
 Compartment
 25-54-12-000-003  Removal of the Sidewall Panels in the FWD Cargo
 Compartment
 25-54-12-400-001  Installation of the FWD Cargo Compartment Partition
 FR34
 25-54-12-400-002  Installation of the Ceiling Panels in the FWD Cargo
 Compartment
 25-54-12-400-003  Installation of the Sidewall Panels in the FWD Cargo
 Compartment
 25-55-11-000-001  Removal of the AFT Cargo-Compartment Partition FR47
 25-55-11-000-002  Removal of the Ceiling Panels in the AFT Cargo
 Compartment - FR47/FR59
 25-55-11-000-003  Removal of the Sidewall Panels in the AFT Cargo
 Compartment - FR47/FR59
 25-55-11-400-001  Installation of the AFT Cargo-Compartment Partition
 FR47
 25-55-11-400-002  Installation of the Ceiling Panels in the AFT Cargo
 Compartment -FR47/FR59
 25-55-11-400-003  Installation of the Sidewall Panels in the AFT Cargo
 Compartment - FR47/FR59
 25-55-12-000-001  Removal of the AFT Cargo Compartment Partition FR65
 25-55-12-000-002  Removal of the Ceiling Panels in the AFT Cargo
 Compartment - FR59/FR65
 25-55-12-000-003  Removal of the Sidewall Panels in the AFT Cargo
 Compartment - FR59/FR65
 25-55-12-400-001  Installation of the AFT Cargo Compartment Partition
 FR65
 25-55-12-400-002  Installation of the Ceiling Panels in the AFT Cargo
 Compartment - FR59/FR65

 EFF : ALL 25-00-00Page A878

Aug 01/05
R
 CES  -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------


25-55-12-400-003 Installation of the Sidewall Panels in the AFT Cargo Compartment - FR59/FR65 52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump 52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the
 Yellow Electric Pump AMM 11-35-25 P.Block 001 AMM 11-36-25 P.Block 001 25-00-00-991-011 Fig. 835 25-00-00-991-049 Fig. 836
 3. Job Set-up
__________
 Subtask 25-00-00-861-088
 A. Energize the ground service network
 (Ref. TASK 24-42-00-861-001).

 Subtask 25-00-00-010-096
 B. Get Access
 (1)
 Open the related cargo compartment door (Ref. TASK 52-30-00-860-001).

 (2)
 Put the ACCESS PLATFORM 2M (6 FT) in position.


 Subtask 25-00-00-020-086
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备1(89)