• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-21 08:20来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (2)
 Install the cover.

 (3)
 Close the door of the related overhead stowage compartment.

 (4)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.


 Subtask 25-21-34-862-051
 B. De-energize the ground service network
 (Ref. TASK 24-42-00-862-001).

 

 SEAT - PASSENGER - REMOVAL/INSTALLATION
_______________________________________
 TASK 25-21-41-000-001
 Removal of the Passenger Seats
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
 No specific AR CAP - BLANKING
 No specific 1 WRENCH - GROOVE NUT

 B. Consumable Materials
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
Material No. 08-074
 MASKING TAPE (Ref. 20-31-00)

 C. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External
 Power
 25-28-41-000-001 Removal of the Textile Floor-Covering
 25-21-41-991-002 Fig. 401

R **ON A/C 001-049, 101-105, 151-199, 301-399, 401-499,
 25-21-41-991-006-D Fig. 402
 EFF : ALL


25-21-41Page 401


 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
R  **ON A/C 051-099, 201-210, 
R  25-21-41-991-006-C  Fig. 402A 
R  **ON A/C 106-149, 211-299, 
R  25-21-41-991-006-B  Fig. 402B 
R  **ON A/C ALL
 3. Job Set-up__________
 Subtask 25-21-41-860-050
 A. Aircraft Maintenance Configuration
 (1) Energize the ground service network (Ref. TASK 24-42-00-861-001).
 (2) Make sure that: - The folding tables are in the folded position. - The seat backrests are in the vertical position. - If folding legrests are installed, they are in the extended position.
 (3) If emergency-exit location lights or emergency lights are installed on the seats, make sure that: - In the cockpit, on the overhead panel 25VU (SIGNS), the EMER EXIT LT switch is set to the OFF position. - On the forward attendant panel (FAP) 120RH, the LIGHT EMER pushbutton switch is set to the OFF position.

 EFF : ALL

25-21-41Page 402


 **ON A/C 051-099,
 Subtask 25-21-41-865-052-B
 B. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION FIN LOCATION -------------------------------------------------------------------------------2000VU PES/MUSIC/CTL 21MK D1
 **ON A/C 106-149, 211-299,
 Subtask 25-21-41-865-052-A
 B. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION FIN LOCATION -------------------------------------------------------------------------------2000VU PES/MUSIC/CTL 21MK D1 2000VU PES/MUSIC/CABIN/LH 23MK D2 2000VU PES/MUSIC/CABIN/RH 24MK D3
 **ON A/C 201-210,
 Subtask 25-21-41-865-052
 B. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION FIN LOCATION -------------------------------------------------------------------------------2000VU PES/MUSIC/CTL 21MK D1 2000VU PES/MUSIC/LH 23MK D2 2000VU PES/MUSIC/RH 24MK D3
 **ON A/C 301-399,
 Subtask 25-21-41-865-068
 C. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION FIN LOCATION -------------------------------------------------------------------------------2000VU PED 50HP B8  EFF : ALL


R  **ON A/C 401-499, 
R  Subtask 25-21-41-865-068-A 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备1(140)