• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-21 08:20来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 -------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
 from the External Power 25-11-61-000-001 Removal of the Captain (First Officer) Seat Cushion 25-11-61-400-001 Installation of the Captain (First Officer) Seat
 Cushion 25-11-64-000-001 Removal of the Captain (First Officer) Seat-Headrest Assy 25-11-64-400-001 Installation of the Captain (First Officer) Seat-Headrest Assy 25-11-63-991-001 Fig. 401
 3. Job Set-up
__________
 Subtask 25-11-63-861-051
 A. Make sure that the aircraft electrical circuits are energized (Ref. TASK 24-41-00-861-002).
 EFF : ALL

25-11-63Page 406


R  Subtask 25-11-63-410-050 
R  B. Aircraft Maintenance Configuration 
R R  (1) Make sure that the Captain (First Officer) seat cushion is removed (Ref. TASK 25-11-61-000-001). 
R R  (2) Make sure that the Captain (First Officer) seat headrest assy is removed (Ref. TASK 25-11-64-000-001).
 4. Procedure_________
 Subtask 25-11-63-420-050
 A. Installation of the Captain (First Officer) Seat Crotch Strap (Ref. Fig. 401/TASK 25-11-63-991-001)
 (1) Clean the component interface and/or the adjacent area. 
R  (2) Put the crotch strap (25) in position on the seat pan (24). 
R R  (3) Install the screws (20), the washers (21) and (28) and new self-locking nuts (23). 
R  (4) Tighten the self-locking nuts (23).
 Subtask 25-11-63-420-051
 B. Installation of the Captain (First Officer) Seat Harness Assy (Ref. Fig. 401/TASK 25-11-63-991-001)
 (1) Clean the component interface and/or the adjacent area. 
R R  (2) Put the reel assy (5) in position on the backrest structure and install the six screws (2), the washers (3) and the nuts (4). 
R  (3) Tighten the six nuts (4). 
R R  (4) Put the control lever (28) in position and install the two screws (26), the washers (27) and the nuts (29). 
R  (5) Tighten the two nuts (29). 
R  (6) Put the knob (31) in position and install the screw (30). 
R  (7) Tighten the screw (30).

 EFF : ALL

25-11-63Page 407
Nov 01/02


R  (8) Connect the cable (14) to the reel assy (5) and install the roll pin 
R  (15) in the cable end (16). 
R  (9) Put the abdominal strap (6) with the buckle in position, and install 
R  the screw (7), the washer (8) and a new self-locking nut (9). 
R  (10) Tighten the self-locking nut (9). 
R  (11) Put the abdominal strap (13) with the connector in position, and 
R  install the screw (12), the washer (11) and a new self-locking nut 
R  (10). 
R  (12) Tighten the self-locking nut (10). 
R  (13) Put the reel cover (19) in position and install the screw (18) and 
R  the washer (17). 
R  (14) Tighten the screw (18). 
R  Subtask 25-11-63-420-052-A 
R  C. Installation of the Captain (First Officer) Seat Headrest Assy (Ref. TASK 
R  25-11-64-400-001). 
R  Subtask 25-11-63-420-053-A 
R  D. Installation of the Captain (First Officer) Seat Cushion (Ref. TASK 25-
R  11-61-400-001).
 5. Close-up________
 Subtask 25-11-63-862-050
 A. Installation of the Seat Equipment
 (1) Make sure that the work area is clean and clear of tool(s) and other
 items.
 (2) De-energize the aircraft electrical circuits
 (Ref. TASK 24-41-00-862-002).

 EFF : ALL

25-11-63Page 408
Nov 01/02


 HEADREST - SEAT, CAPTAIN/FIRST OFFICER - REMOVAL/INSTALLATION
_____________________________________________________________
 TASK 25-11-64-000-001 Removal of the Captain (First Officer) Seat-Headrest Assy
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001  Energize the Ground Service Network from the External Power 25-11-64-991-001 Fig. 401
 3. Job Set-up
__________ Subtask 25-11-64-861-050
 A. Energize the ground service network
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备1(110)