(2)
Remove the casing (3).
(3)
Remove the screws (4).
(4)
Remove the roller blind (1).
(5)
Remove and discard the O-rings (5).
EFF : ALL
25-13-42Page 401
Sliding Window Roller-Blind
Figure 401/TASK 25-13-42-991-001
EFF : ALL 25-13-42 Page 402
May 01/98
CES
TASK 25-13-42-400-001 Installation of the Sliding Window Roller-Blind
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Expendable Parts
-------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
O-rings 25-13-13 01 -080
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
25-13-42-991-001 Fig. 401
3. Job Set-up
__________ Subtask 25-13-42-860-051
A. Aircraft Maintenance Configuration
(1) Make sure that the sliding window is open.
4. Procedure
_________ (Ref. Fig. 401/TASK 25-13-42-991-001) Subtask 25-13-42-420-050
A. Installation of the Sliding Window Roller-Blind
(1)
Put the new O-rings (5) in position.
(2)
Put the roller blind (1) in position.
(3)
Install the screws (4) and tighten them.
EFF : ALL
25-13-42Page 403
(4)
Put the casing (3) in position.
(5)
Install the screws (2) and tighten them.
5. Close-up
________ Subtask 25-13-42-860-052
A. Put the aircraft back to its initial configuration.
(1)
Close the sliding window.
(2)
Make sure that the work area is clean and clear of tool(s) and other items.
EFF : ALL
25-13-42Page 404
ROLLER BLIND - FIXED WINDOW - REMOVAL/INSTALLATION
__________________________________________________
TASK 25-13-43-000-001 Removal of the Fixed Window Roller-Blind
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
25-13-43-991-001 Fig. 401
3. Job Set-up
__________ Subtask 25-13-43-860-050
A. Aircraft Maintenance Configuration
(1)
On the fixed window remove the screws (2).
(2)
Remove the cover (1).
4. Procedure
_________ (Ref. Fig. 401/TASK 25-13-43-991-001) Subtask 25-13-43-020-050
A. Removal of the Fixed Window Roller-Blind
(1)
Remove the screws (3) and washers (4).
(2)
Remove the roller blind (5).
EFF : ALL
25-13-43Page 401
Fixed Window Roller-Blind
Figure 401/TASK 25-13-43-991-001
EFF : ALL 25-13-43 Page 402
Feb 01/98
CES
TASK 25-13-43-400-001 Installation of the Fixed Window Roller-Blind
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
25-13-43-991-001 Fig. 401
3. Job Set-up
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备1(129)