• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-21 08:20来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者


 5. Close-up
________ Subtask 25-00-00-862-083
 A. De-energize the ground service network
 (Ref. TASK 24-42-00-862-001).

 EFF : ALL

25-00-00Page 855
Aug 01/05
R
 CES  EFF : ALL


 TASK 25-00-00-340-011 
R  Repair of an Overhead Stowage Compartment
 1. Reason for the Job__________________
 Self Explanatory
 2. Job Set-up Information______________________ 
R  A. Fixtures, Tools, Test and Support Equipment 
R R R  -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
R R  No specific No specific  1 SPATULA - NON METALLIC 1 SPATULA - PLASTIC 
R  B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------

R R R  No specific No specific Material No. 05-110  emery cloth 320-400 grade emery cloth, 200-300 grade USA BMS 8-223 
R  Material No. 08-004  LAMINATE,CARGO LINER (Ref. 20-31-00)USA MIL-A-25457
R  Material No. 08-017A  ADHESIVE SEALANT (Ref. 20-31-00) USA DOD-A-82720 
R R  Material No. 08-074  ADHESIVE STRUCTURAL FLEXIBLE (Ref. 20-31-00) 
R R  Material No. 11-006  MASKING TAPE (Ref. 20-31-00) USA OM-232-GR-A AMS-3004 MIL-A-6090 
R  Material No. 11-010  METHYL ALCOHOL (Ref. 20-31-00)USA TT-I-735 GRADE A
R  Material No. 16-045  ISOPROPYL ALCOHOL (Ref. 20-31-00) 
R  Material No. 19-003  SEALANT POREFILLER (Ref. 20-31-00)USA AMS 3819
 LINT-FREE COTTON CLOTH (Ref. 20-31-00)


25-00-00Page 856
Aug 01/05


R  C. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
R R R R R R  24-42-00-861-001 24-42-00-862-001 25-00-00-370-001 25-24-41-000-001 25-24-41-400-001 25-00-00-991-005 25-00-00-991-047 25-00-00-991-032  Energize the Ground Service Network from the External PowerDe-energize the Ground Service Network Supplied from the External Power Repair of Painted Components Removal of the Overhead Stowage Compartments Installation of the Overhead Stowage Compartments Fig. 804 Fig. 810 Fig. 811
 3. Job Set-up__________
 Subtask 25-00-00-861-069
 A. Energize the ground service network (Ref. TASK 24-42-00-861-001).
 4. Procedure_________
 Subtask 25-00-00-340-067 
R R  A. Attachment of the Seal of the Overhead-Stowage-Compartment (Ref. Fig. 810/TASK 25-00-00-991-047)
 WARNING : OBEY THE MANUFACTURER'S INSTRUCTIONS WHEN YOU USE THIS/THESE_______ MATERIAL/S. USE PROTECTIVE CLOTHING, RUBBER GLOVES, GOGGLES AND A MASK.

 EFF : ALL

25-00-00Page 857
Aug 01/05


R  Seal - OHSC Figure 810/TASK 25-00-00-991-047
 EFF :  ALL  25-00-00 Page 858 Aug 01/05
 CES 

 

 WARNING : MAKE SURE THAT THERE IS A GOOD FLOW OF AIR THROUGH THE WORK
_______ AREA WHEN YOU USE SPECIAL MATERIALS. IF YOU GET ONE OF THESE MATERIALS ON YOUR SKIN, IN YOUR MOUTH OR IN YOUR EYES : -FLUSH IT AWAY WITH A FLOW OF CLEAN WATER FOR BETWEEN 10 AND 15 MINUTES. -GET IMMEDIATE MEDICAL AID IF IRRITATION OCCURS. DO NOT BREATHE THE FUMES FROM THE MATERIAL. DO NOT SMOKE WHEN YOU USE THE MATERIAL. DO NOT USE THE MATERIAL NEAR A FLAME, SPARKS OR SOURCES OF HEAT. THESE MATERIALS ARE DANGEROUS : THEY ARE POISONOUS, FLAMMABLE AND SKIN IRRITANTS.
 (1)
 Open the related door (1)

 (2)
 If necessary, remove the seal (2).

 (3)
 Clean the repair area and the seal with a lint-free cotton cloth MISCELLANEOUS (Material No. 19-003) and CLEANING AGENTS (Material No. 11-010).

 (4)
 Apply BONDING AND ADHESIVE COMPOUNDS (Material No. 08-004) to the bonding area.


 NOTE : Refer to the manufacturers instruction for the correct
____
 procedure.

 (5)
 Put the seal (2) in position and carefully push it on to the structure of the overhead-stowage-compartment.

 (6)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (7)
 Close the door (1).


 EFF : ALL

25-00-00Page 859
Aug 01/05
R
 CES  EFF : ALL


R  Subtask 25-00-00-340-107 
R  B. Repair of the Bottom Panel of the Overhead Stowage Compartment(s) 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备1(58)