• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-21 08:20来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 or
 (Ref. TASK 25-22-43-000-001).

 

 EFF : ALL

25-22-00Page 402


 TASK 25-22-00-440-001
 Reactivation of a Defective Cabin Attendant Seat
 1. Reason for the Job
__________________
 Refer to the MMEL TASK: 25-22-01
 Cabin Attendant Seats

 2. Job Set-up Information
______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from
 the External Power 25-22-41-000-001 Removal of the Wall-Mounted Cabin-Attendant Seats 25-22-41-400-001 Installation of the Wall-Mounted Cabin-Attendant
 Seats 25-22-42-000-001 Removal of the Free-Standing Cabin-Attendant Seat(s) 25-22-42-400-001 Installation of the Free-Standing Cabin-Attendant
 Seat(s) 25-22-43-000-001 Removal of the Cabin Attendant Swivel-Seat 25-22-43-400-001 Installation of the Cabin Attendant Swivel-Seat
 3. Job Set-up
__________
 Subtask 25-22-00-861-053
 A. Energize the ground service network
 (Ref. TASK 24-42-00-861-001).

 EFF : ALL

25-22-00Page 403


 4. Procedure
_________
 Subtask 25-22-00-440-050
 A. Reactivation of a Defective Cabin Attendant Seat
 (1)
 If necessary, remove the safetied seat: (Ref. TASK 25-22-41-000-001) or (Ref. TASK 25-22-42-000-001) or (Ref. TASK 25-22-43-000-001).

 (2)
 Install the repaired or new cabin attendant seat: (Ref. TASK 25-22-41-400-001) or (Ref. TASK 25-22-42-400-001) or (Ref. TASK 25-22-43-400-001).


 5. Close-up
________
 Subtask 25-22-00-862-052
 A. De-energize the ground service network
 (Ref. TASK 24-42-00-862-001).

 EFF : ALL

25-22-00Page 404


 CABIN ATTENDANT SEATS - INSPECTION/CHECK
________________________________________ TASK 25-22-00-210-001 R Detailed Visual Inspection of Cabin Attendant Seats Attachment General Visual R Inspection of Seats Structure
 1. Reason for the Job
__________________
 Refer to the MPD TASK: 252200-01
 2. Job Set-up Information
______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 24-42-00-862-001
3. Job Set-up
__________ Subtask 25-22-00-861-050
Energize the Ground Service Network from the External PowerDe-energize the Ground Service Network Supplied from the External Power
 A. Energize the ground service network (Ref. TASK 24-42-00-861-001).
 4. Procedure_________
 Subtask 25-22-00-210-050 
R  A. Do the Visual Inspection/Check of the Cabin Attendant Seats
 (1) Make sure that the structure of the seats is not damaged or cracked.
 (2) Make sure that the fittings are correctly installed.
 (3) Make sure that the holes, the bolts and the screws are in the correct condition and have no corrosion. 
R  (4) Make sure that the seat assemblies are not loose.

 EFF : ALL

25-22-00Page 601


 5. Close-up
________ Subtask 25-22-00-210-051
 A. Make sure that the work area is clean and clear of tool(s) and other items.
 Subtask 25-22-00-862-050
 B. De-energize the ground service network
 (Ref. TASK 24-42-00-862-001).

 EFF : ALL

25-22-00Page 602


 TASK 25-22-00-210-002
R Detailed Visual Inspectionof of Seat-Belts Attachment, Seat Belts and Locks R Check of Locks
 1.
 Reason for the Job

__________________
 Refer to the MPD TASK: 252200-02


 2.
 Job Set-up Information


______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001  Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from the External Power 25-22-00-991-001 Fig. 601
 3. Job Set-up
__________
 Subtask 25-22-00-861-051

 A. Energize the ground service network
 (Ref. TASK 24-42-00-861-001).
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备1(149)