• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-21 08:20来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者


___________
 A. Linings The shapes and colors of the linings have been designed to provide a harmonious and sound-insulated cockpit. All the elements located in the areas near the pilot's head have been protected by foam linings. The linings are made from the following materials :
 (1)
 Monolithic: fiber + resin

 (2)
 Sandwich : fiber + resin + Nomex (Honeycomb)

 (3)
 Imitation leather foam sections :

 (a)
 Front and side strips

 (b)
 Assist handles

 (c)
 Top of glareshield

 (d)
 Top of console

 

 (4)
 Flocked sections : Various stowages in the consoles and ceiling lining panels


 B. Floor covering
 (Ref. Fig. 002)
 The cockpit floor is covered with easy-to-clean and sun-and
 moisture-resistant carpet.

 EFF : ALL

25-13-00Page 1


 Cockpit Lining and Furnishings
 Figure 001
 EFF :  ALL  25-13-00 Page 2 
Feb 01/98
 CES 

 

 Cockpit Carpet Installation
 Figure 002
 EFF :  ALL  25-13-00 Page 3 
Feb 01/98
 CES 

 

 LINING AND FURNISHINGS - DEACTIVATION/REACTIVATION
__________________________________________________
 TASK 25-13-00-040-001 Deactivation of the Captain and/or First Officer Sliding-Tables
 1.
 Reason for the Job

__________________
 Refer to the MMEL TASK: TBD


 2.
 Job Set-up Information


______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
25-13-14-000-002 Removal of the Sliding Table
 3. Job Set-up
__________ Subtask 25-13-00-860-051
 A. Not Applicable
 4. Procedure
_________ Subtask 25-13-00-020-050
 A. Deactivation of the Captain and/or First Officer Sliding-Tables
 (1) Remove the defective Captain and/or First Officer sliding-tables (Ref. TASK 25-13-14-000-002).
 5. Close-up
________ Subtask 25-13-00-860-052
 A. Make sure that the work area is clean and clear of tool(s) and other items.
 EFF : ALL

25-13-00Page 401


 TASK 25-13-00-440-001 Reactivation of the Captain and/or First Officer Sliding-Tables
 1.
 Reason for the Job

__________________
 Refer to the MMEL TASK: TBD


 2.
 Job Set-up Information


______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
25-13-14-400-002 Installation of the Sliding Table
 3. Job Set-up
__________ Subtask 25-13-00-860-053
 A. Not Applicable
 4. Procedure
_________ Subtask 25-13-00-420-050
 A. Reactivation of the Captain and/or First Officer Sliding-Tables
 (1) Install new Captain and/or First Officer sliding-tables (Ref. TASK 25-13-14-400-002).
 5. Close-up
________ Subtask 25-13-00-860-054
 A. Make sure that the work area is clean and clear of tool(s) and other items.
 EFF : ALL

25-13-00Page 402


 TASK 25-13-00-040-002 Deactivation of the Captain and/or First Officer Retractable Foot-Rests
 1.
 Reason for the Job

__________________
 Refer to the MMEL TASK: TBD


 2.
 Job Set-up Information


______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
25-13-14-000-005  Removal of the Captain and First-Officer Retractable Foot-Rests
 3. Job Set-up
__________ Subtask 25-13-00-860-055
 A. Not Applicable
 4. Procedure
_________ Subtask 25-13-00-020-051
 A. Deactivation of the Captain and/or First-Officer Retractable Foot-Rests
 (1) Remove the defective Captain and/or First-Officer retractable foot-rests (Ref. TASK 25-13-14-000-005).
 5. Close-up
________ Subtask 25-13-00-860-056
 A. Make sure that the work area is clean and clear of tool(s) and other items.
 EFF : ALL

25-13-00Page 403
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备1(119)