CHAPTER 25
__________
EQUIPMENT/FURNISHINGS
TABLE OF CONTENTS
_________________
SUBJECT_______ CH/SE/SU _ PAGE EFFECTIVITY________ C ____ ___________ Operation/Control and Indicating 15 301-399, Heated Floor Panel System 15 301-399, BITE Test 15 301-399, Heated Floor Panel System 15 301-399,
ANCILLARY EQUIPMENT (INCLUDING DOOR 25-27-00
AREA HEATING PANELS)
ADJUSTMENT/TEST 501 301-399,
Bite Test of the Heated Floor 501 301-399,
Panel System.
Operational Check of the Floor 505 301-399,
Panel Heating System by using the
Test Button on each Control Unit.
STOWAGE - EMERGENCY EQUIPMENT L AND R 25-27-15
REMOVAL/INSTALLATION 401 ALL
Removal of an Emergency Equipment 401 ALL
Stowage
Installation of an Emergency 404 ALL
Equipment Stowage
CONTROL UNIT - DOOR AREA HEATING 25-27-34
REMOVAL/INSTALLATION 401 301-399,
Removal of the Control Unit 4DS, 401 301-399,
14DS
Installation of the Control Unit 405 301-399,
4DS, 14DS
STOWAGE 25-27-44 REMOVAL/INSTALLATION 401 001-049, 101-105
151-199, 201-210 Removal of a Stowage FWD LH (Zone 401 001-049, 101-105 231) 151-199, 201-210 Installation of a Stowage FWD LH 409 001-049, 101-105 (Zone 231) 151-199, 201-210 Removal of a Stowage FWD RH (Zone 417 001-049, 101-105 232) 151-199, 201-210 Installation of a Stowage FWD RH 421 001-049, 101-105 (Zone 232) 151-199, 201-210
DOG HOUSE 25-27-46
REMOVAL/INSTALLATION 401 001-049, 101-149 151-199, 201-299 301-399, 401-499
Removal of a Doghouse 401 001-049, 101-149 151-199, 201-299 301-399, 401-499
Installation of a Doghouse 404 001-049, 101-149 151-199, 201-299
25-CONTENTS Page 17 Aug 01/05 R CES
CHAPTER 25
__________
EQUIPMENT/FURNISHINGS
TABLE OF CONTENTS
_________________
SUBJECT_______ CH/SE/SU _ PAGE EFFECTIVITY________ C ____ ___________
301-399, 401-499 Installation of a Doghouse MID 407 151-199, Removal of a Doghouse AFT 411 151-199, 201-210 Installation of a Doghouse AFT 415 151-199, 201-210
FLOOR PANEL - HEATED, DOOR AREA 25-27-51
REMOVAL/INSTALLATION 401 301-399,
Removal of the Heated Floor Panel 401 301-399,
5DS (6DS), 15DS (16DS)
Installation of the Heated Floor 405 301-399,
Panel 5DS (6DS), 15DS (16DS)
FLOOR COVERING 25-28-00
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Component Location 1 ALL
Component Description 1 ALL
The floor covering gives 1 ALL passenger-comfort, soundproofing and is the protection for the floor panels and the floor structure. The floor Passenger Area 1 ALL Utility (Wet) Area 4 ALL
COVERING - FLOOR, TEXTILE 25-28-41
REMOVAL/INSTALLATION 401 ALL
Removal of the Textile 401 ALL
Floor-Covering
Installation of the Textile 404 ALL
Floor-Covering
COVERING - FLOOR NON TEXTILE 25-28-42
REMOVAL/INSTALLATION 401 ALL
Removal of the Non-Textile Floor 401 ALL
Covering (NTF)
Installation of the Non-Textile 420 ALL
Floor Covering (NTF)
Removal of NTF (Welding Procedure) 443 ALL
Installation of NTF (Welding 453 ALL
Procedure)
PROTECTION - FLOOR, MOISTURE BARRIER 25-28-43
FOIL
REMOVAL/INSTALLATION 401 ALL
Removal of Moisture Barrier Foil 401 ALL
(MYLAR)
Installation of Moisture Barrier 406 ALL
Foil (MYLAR)
25-CONTENTS Page 18 Aug 01/05 R CES
CHAPTER 25
__________
EQUIPMENT/FURNISHINGS
TABLE OF CONTENTS
_________________
SUBJECT_______ CH/SE/SU _ PAGE EFFECTIVITY
________ C ____ ___________ ELECTRICAL SERVICE SUPPLY 25-29-00
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Component Location 1 ALL
System Description 1 ALL
The FWD Cabin System 1 ALL
The AFT Cabin System 1 ALL
Power Supply 1 ALL
BUFFET AND GALLEY 25-30-00
_________________
DESCRIPTION AND OPERATION 1 ALL General 1 ALL Component Location 1 ALL System Description 1 001-049, 051-099
101-149, 151-199 201-299, 401-499 Forward Galleys (Ref. 25-31-00) 1 001-049, 051-099 101-149, 151-199 201-299, 401-499 Aft Galleys (Ref. 25-33-00) 1 001-049, 051-099 101-149, 151-199 201-299, 401-499 Galley Epuipment (Ref. 25-35-00) 1 001-049, 051-099 101-149, 151-199 201-299, 401-499