• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-21 08:20来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

R  (a) Mix 20 parts by weight of STRUCTURE PAINTS (Material No. 16-047) 
R  (lacquer 404-12) and 1 part by weight of STRUCTURE PAINTS 
R  (Material No. 16-047) (hardener 400). 
R  NOTE : The necessary viscosity is 17-23 seconds, 4 mm (0.16 in.)____ 
R  DIN cup. 
R  (b) Permit the mixture 15 minutes reaction time before use. 
R  NOTE : Pot life is 8 hours maximum.____ 
R  It will be necessary to add STRUCTURE PAINTS (Material No. 
R  16-047) (thinner 62) after approx. 4 hours to keep the 
R  necessary viscosity. 
R  NOTE : Conditions for use:____ 
R  - Temperature between 15 DEG.C (59.00 DEG.F) and 30 DEG.C 
R  (86.00 DEG.F), 
R  - Relative humidity 35-75% . 
R  (c) For a textured finish apply the mixture in 1-4 cross coats with a 
R  GUN - AIR SPRAY, STANDARD PAINT and a NOZZLE DIA 1.5 MM (1/16 
R  IN). 
R  NOTE : The necessary coat thickness of a textured finish is____ 
R  between 0.03 mm (0.0011 in.) and 0.09 mm (0.0035 in.). 
R  NOTE : The textured finish is:____ 
R  - Dust dry after 20 minutes, 
R  - Transport dry after 8 hours, 
R  - Fully dry after 7 days at room temperature. 
R  Over-painting: Between 20 minutes and 12 hours. 
R  NOTE : If the drying time between the coats is more than 12____ 
R  hours: 
R  - Clean the repair with CLEANING AGENTS (Material No. 11-
R  010) and a lint-free cotton cloth MISCELLANEOUS 
R  (Material No. 19-003), 
R  or 
R  - Rub it with emery cloth, 320-400 grade and clean it with 
R  CLEANING AGENTS (Material No. 11-010) and a lint-free 
R  cotton cloth MISCELLANEOUS (Material No. 19-003). 
R  NOTE : To make the cure faster you can add heat 60 DEG.C (140.00____ 
R  DEG.F) to the repair. 
R  The textured finish is then:

 EFF : ALL

25-00-00Page 881


R  - Transport dry after 60-90 minutes, 
R  - Fully dry after 12 hours. 
R  Over-painting: Heat-cured for 20 minutes maximum if you 
R  do not clean or rub the repair. 
R  (6) Remove the masking tape and the masking paper from the adjacent 
R  components or areas. 
R  5. Close-up________ 
R  Subtask 25-00-00-410-091 
R  A. Close Access 
R  (1) If necessary, install the component in the aircraft (refer to the 
R  related AMM chapter). 
R  (2) Remove the ground support and maintenance equipment, the special and 
R  standard tools and all other items. 
R  Subtask 25-00-00-862-086 
R  B. De-energize the ground service network 
R  (Ref. TASK 24-42-00-862-001).

 EFF : ALL

25-00-00Page 882
Aug 01/05


R **ON A/C 004-049, 053-099, 101-149, 151-199, 201-299, 301-399, 401-499,

 TASK 25-00-00-340-013
 Toilet Shroud - Repair
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
No specific emery cloth, 320-400 grade Material No. 08-051 USA MMM-A-132 TYPE I EPOXY RESIN (Ref. 20-31-00) Material No. 11-010 USA TT-I-735 GRADE A ISOPROPYL ALCOHOL (Ref. 20-31-00) Material No. 19-003 USA AMS 3819 LINT-FREE COTTON CLOTH (Ref. 20-31-00)
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from
 the External Power 25-45-22-000-001 Removal of the Toilet Shroud and the Seat 25-45-22-400-001 Installation of the Toilet Shroud and the Seat 25-00-00-991-021 Fig. 814
 3. Job Set-up
__________
 Subtask 25-00-00-861-071
 A. Energize the ground service network
 (Ref. TASK 24-42-00-861-001).


R  EFF : 004-049, 053-099, 101-149, 151-199, 25-00-00Page 883 201-299, 301-399, 401-499, Aug 01/05
 CES  Subtask 25-00-00-010-077
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备1(65)