EFF : ALL
25-00-00Page 881
R - Transport dry after 60-90 minutes,
R - Fully dry after 12 hours.
R Over-painting: Heat-cured for 20 minutes maximum if you
R do not clean or rub the repair.
R (6) Remove the masking tape and the masking paper from the adjacent
R components or areas.
R 5. Close-up________
R Subtask 25-00-00-410-091
R A. Close Access
R (1) If necessary, install the component in the aircraft (refer to the
R related AMM chapter).
R (2) Remove the ground support and maintenance equipment, the special and
R standard tools and all other items.
R Subtask 25-00-00-862-086
R B. De-energize the ground service network
R (Ref. TASK 24-42-00-862-001).
EFF : ALL
25-00-00Page 882
Aug 01/05
R **ON A/C 004-049, 053-099, 101-149, 151-199, 201-299, 301-399, 401-499,
TASK 25-00-00-340-013
Toilet Shroud - Repair
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
No specific emery cloth, 320-400 grade Material No. 08-051 USA MMM-A-132 TYPE I EPOXY RESIN (Ref. 20-31-00) Material No. 11-010 USA TT-I-735 GRADE A ISOPROPYL ALCOHOL (Ref. 20-31-00) Material No. 19-003 USA AMS 3819 LINT-FREE COTTON CLOTH (Ref. 20-31-00)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from
the External Power 25-45-22-000-001 Removal of the Toilet Shroud and the Seat 25-45-22-400-001 Installation of the Toilet Shroud and the Seat 25-00-00-991-021 Fig. 814
3. Job Set-up
__________
Subtask 25-00-00-861-071
A. Energize the ground service network
(Ref. TASK 24-42-00-861-001).
R EFF : 004-049, 053-099, 101-149, 151-199, 25-00-00Page 883 201-299, 301-399, 401-499, Aug 01/05
CES Subtask 25-00-00-010-077
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备1(65)