 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
R R R R  24-42-00-861-001 24-42-00-862-001 25-13-41-991-002 25-13-41-991-003 25-13-41-991-004 25-13-41-991-005 25-13-41-991-006  Energize the Ground Service Network from the External PowerDe-energize the Ground Service Network Supplied from the External PowerFig. 402 Fig. 403 Fig. 404 Fig. 405 Fig. 406
 3. Job Set-up__________
 Subtask 25-13-41-861-051
 A. Energize the ground service network (Ref. TASK 24-42-00-861-001).
 4. Procedure_________
 Subtask 25-13-41-210-050
 A. Preparation for installation
 (1) Clean the component interface and/or the adjacent area.
 (2) Do an inspection of the component interface and/or the adjacent area.

 EFF : ALL

25-13-41Page 414


 Subtask 25-13-41-420-051
 B. Installation of the Panels 211EW, 212EW, 211FW, 212FW, 211DW, 212DW
 (Ref. Fig. 402/TASK 25-13-41-991-002)
 (1) Installation of the panel 211EW (212EW)
 (a) Put the panel (6) in position.
 (b) Install the washers (9) and the screws (8), tighten them.
 (c) Install the washer (10) and the screw (11), tighten it.
 (d) Install the wastebin (7).
 (2) Installation of the panel 211FW (212FW)
 (a) Put the panel (14) in position.
 (b) Connect the plug behind the panel 17VU (16VU) (13).
 (c) Install the washers (11) and the screws (12), tighten them.
 (d) Lock the fasteners (4).
 (3) Installation of the Panel 211DW (212DW)
 (a) Put the panel (1), ((5)) in position.
 (b) Install the washers (3) and the screws (2), tighten them.
 (c) Lock the fasteners (4). 
R  Subtask 25-13-41-420-052 
R  C. Installation of the Panels 211AWW, 212AW, 211BW, 212BW 
R  (Ref. Fig. 403/TASK 25-13-41-991-003) 
R  (1) Installation of the panel 211AW (212AW) 
R  (a) Put the panel (3) in position. 
R  (b) Install the washers (1) and the screws (2). Tighten the screws. 
R  (c) Lock the fasteners (4).

 EFF : ALL

25-13-41Page 415
Nov 01/00


R  (2) Installation of the panel 211BW (212BW) 
R  (a) Put the panel (5) in position. 
R  (b) Install the washer (8), the screw (7) and the ramp (9). Tighten 
R  the screw. 
R  (c) Install the screw (10) and the washer (11). Tighten it. 
R  (d) Install the screw (6). Tighten it. 
R  Subtask 25-13-41-420-053 
R  D. Installation of the Panel 211LW 
R  (Ref. Fig. 404/TASK 25-13-41-991-004) 
R  (1) Put the panel (4) in position. 
R  (2) Install the washers (2) and the screws (1). Tighten the screws. 
R  (3) Lock the fastener (3). 
R  Subtask 25-13-41-420-054 
R  E. Installation of the Panels 212HW and 212JW 
R  (Ref. Fig. 405/TASK 25-13-41-991-005) 
R  (1) Installation of the panel 212HW 
R  (a) Put the panel (5) in position. 
R  (b) Install the washers (7) and the screws (6). Tighten the screws. 
R  (c) Lock the fasteners (4). 
R  (2) Installation of the panel 212JW 
R  (a) Put the panel (1) in position. 
R  (b) Install the washers (3) and the screws (2). Tighten the screws. 
R  (c) Install the panel 212DW.

 EFF : ALL

25-13-41Page 416
Nov 01/00


R  Subtask 25-13-41-420-055 
R R  F. Installation of the Panel 212KW (Ref. Fig. 406/TASK 25-13-41-991-006) 
R  (1) Put the panel (1) in position. 
R  (2) Lock the fasteners (2).
 5. Close-up________
 Subtask 25-13-41-410-050
 A. Make sure that the work area is clean and clear of tool(s) and other items.
 Subtask 25-13-41-862-050
 B. De-energize the ground service network (Ref. TASK 24-42-00-862-001).

 EFF : ALL

25-13-41Page 417


 ROLLER BLIND - SLIDING WINDOW - REMOVAL/INSTALLATION
____________________________________________________
 TASK 25-13-42-000-001 Removal of the Sliding Window Roller-Blind
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Referenced Information
 