e) TERR INOP light
For Training Purpose Only Printed:May 2005
B757-200 Aircraft Recurrent Training Manual - 68 -
PASS FAIL
3. End of master dim and test
END OF INSTALLATION TEST
For Training Purpose Only Printed:May 2005
Part 2 FDAMS
B757-200 Aircraft Recurrent Training Manual - 69 -
756-0074-105
1.0 PLANNING INFORMATION
1.1 Effectivity China Southwest Airlines
Group I
Type S/N Var. # Type S/N Var. #
757-2Z0 25885 NB291 757-2Z0 27269 NB297
757-2Z0 25886 NB292 757-2Z0 27270 NB298
757-2Z0 25887 NB293 757-2Z0 27367 NB299
757-2Z0 27258 NB294 757-2Z0 27511 NB301
757-2Z0 27259 NB295 757-2Z0 27512 NB302
Group II
Type S/N Var. #
757-2Y0 26155 NB327
Group III
Type S/N Var. # Type S/N Var. #
757-2Z0 29792 NT201 757-2Z0 29793 NT202
1.2 Reason
China Southwest Airlines is replacing the existing Teledyne Digital Flight Data Acquisition
Unit(DFDAU) with a Honeywell Flight Data Acquisition Management System (FDAMS) to
support the latest Boeing defined dataframe for increased Flight Data Recorder (FDR) parameter
recording onboard their Boeing 757-200 aircraft. This engineering order directs the modification,
installation and checkout and is intended for use in conjunction with STC ST00961AT.
1.3 Description
The FDAMS system consists of a DFDAU and an Aircraft Condition Monitoring System (ACMS)
in a single ARINC 600, 6 MCU case. The instructions in this document direct the removal of the
existing DFDAU, M138 and replacement with a new Honeywell FDAMS (Honeywell Part
Number 967-0212-002). The existing LRU will be returned to stores for customer disposition.
This document also provides procedures to verify and/or update the DFDAU data frame and
ACMS software as necessary to support the parameter recording requirements of CFR
14.121.344(d) and optional ACMS optical Quick Access Recorder interface.
1.4 Approval
These accomplishment instructions have been reviewed by a representative of the Federal
AviationAdministration (FAA). The modifications specified in these accomplishment instructions
comply with the applicable Code of Federal Regulations (CFRs) and are FAA approved.
1.5 Manpower
Approximately 4 to 8 man-hours are required to complete these accomplishment instructions. This
estimate includes the hours necessary to complete the Accomplishment Instruction of Section 3. It
does not include the time it may take schedule work, examine work, make parts,
locate tools, or return any disturbed systems to operational status. Additional time should also be
For Training Purpose Only Printed:May 2005
B757-200 Aircraft Recurrent Training Manual - 70 -
expected to perform the Ground Checkout Procedures in appendix A.
1.6 Material
China Southwest Airlines is to supply the LRU and materials for the installation of the FDAMS
DFDAU and database(s) in the aircraft listed in section 1.1 above.
1.7 Tooling
1. ARINC 615 Data Loader Portable (PDL) if database load is required.
2. Cable assembly, FDAMS DFDAU PDL Interface, Honeywell P/N 704-2382-001 (or equivalent)
if database load is required.
3. See appendix A for additional tooling required to conduct the ground checkout procedure.
1.8 Weight and Balance
Weight (lbs.) ARM (in.) Moment (in/lbs.)
Equipment Removed
DFDAU (Teledyne) 26.0 500 13000.0
Equipment Added
FDAMS (Honeywell) 19.0 500 9500.0
Total Change -7.0 -3500.0
1.9 Electrical Load Data
115VAC XFR BUS 1
Equipment Removed
DFDAU (Teledyne) 84.0 VA
Equipment Added
FDAMS (Honeywell) 31.5 VA
Total Change -52.5 VA
1.10 References
Boeing Standard Wiring Practices Manual, Chapter 20
757 Maintenance Manual Subject Chapter 24, 31, 32
757 Illustrated Parts Catalogue Chapter 31
757 Wiring Diagram Manual Chapter 31
Supplemental Type Certificate ST00961AT
1.11 Publications Affected
757 Maintenance Manual Chapter 31
757 Illustrated Parts Catalogue Chapter 31
757 Wiring Diagram Manual Chapter 31
2.0 MATERIAL INFORMATION
2.1 Parts Required
The following LRU and software media is required for completion of this Engineering Order.
Reference Honeywell Component Parts List document 699-82002 for approved alternates.
For Training Purpose Only Printed:May 2005
B757-200 Aircraft Recurrent Training Manual - 71 -
3.0 ACCOMPLISHMENT INSTRUCTIONS
1. Refer to Boeing 757 Maintenance Manual chapter 20-41-00, page 201, STATIC GROUNDING .
MAINTENANCE PRACTICES.
2. Refer to Boeing 757 Maintenance Manual chapter 24-22-00. Page 201, CONTROL (SUPPLY
POWER) - MAINTENANCE PRACTICES.
3. Remove electrical power and insure the aircraft is electrically grounded.
中国航空网 www.aero.cn