曝光台 注意防骗
网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
oceanic and remote areas.
(7) Flightcrew procedures must be in suitable place and used in the event of the loss of the
S-LRNS after dispatch.
(8) Before conducting any operations authorized by this operations specifications, the flightcrew
must be qualified in accordance with the certificate holder's approved training program for the
system and procedures being used.
c. The area of operation permitted is to within China aviation control area.
1. Issued by (Branch Name) ,Regional Administration of CAAC
2. These Operations Specifications are approved by direction of CAAC
Principal Operations Inspector: (Name & Signature of POI)
3. Date Approval is effective (Y/M/D) Amendment Number:
4. The certificate holder hereby accepts and receives the Operations Specifications in this
paragraph.
Certificate Holder Representative: (Name & Signature)
Position: Date(Y/M/D):
CIVIL AVIATION
ADMINISTRATION
OF CHINA CCAR-121 / 135 OPERATIONS SPECIFICATIONS
CAAC DOCUMENT
APPROVAL NO
AC-121-001R1
(Company Name) B0047-1 Certificate No:
Effective Date: Y M D
B0047 NORTH POLAR OPERATIONS
The certificate holder is authorized to conduct north polar operations specified in this paragraph only
within the polar area and areas referenced in paragraph B0039 of these operations specifications, as
defined below. The certificate holder shall not conduct any other polar route operation within any
other area under these operations specifications.
a. The certificate holder is authorized to conduct polar operations using the following aircraft and
equipment.
Table 1
AIRCRAFT
(M/M/S)
POLAR DIVERSION ALTERNATE
AIRPORTS
SPECIAL EQUIPMENT AND PROCEDURES
b. Polar Operations Recovery Plan.
(1) The Polar Operations Recovery plan is maintained in Chapter _______ Subpart _______ of
the General Operations Manual.
(2) The certificate holder must validate the accuracy and completeness of its recovery plan and
diversion data base at least annually.
c. The certificate holder shall conduct all north polar operations in accordance with the following
limitations, provisions, and special requirements:
(1) The north polar area of operation for this operation is defined as the area that lies north of
latitude N 78o 00’.
(2) The certificate holder must also have approval for operations in areas of magnetic unreliability
(Operations Specifications B0023).
(3) Communications capability effective under normal operating conditions for all portions of the
flight route must be available for entry into the north polar area of operations.
(4) A sufficient set of en route polar diversion alternate airports must be identified in Table 1 of
this operations specification, such that one or more can be reasonably expected to be
“suitable” (as defined for ETOPS alternates in Operations Specifications paragraph B0027)
during each flight.
(5) Airplanes are to be equipped with a minimum of two cold weather anti-exposure suits.
(6) Except for all cargo operations, the certificate holder must have an expanded medical kit to
include automated external defibrillators (AED) on board each aircraft listed in Table 1 above.
CIVIL AVIATION
ADMINISTRATION
OF CHINA CCAR-121 / 135 OPERATIONS SPECIFICATIONS
CAAC DOCUMENT
APPROVAL NO
AC-121-001R1
(Company Name) B0047-2 Certificate No:
Effective Date: Y M D
1. Issued by (Branch Name) ,Regional Administration of CAAC
2. These Operations Specifications are approved by direction of CAAC
Principal Operations Inspector: (Name & Signature of POI)
3. Date Approval is effective (Y/M/D) Amendment Number:
4. The certificate holder hereby accepts and receives the Operations Specifications in this
paragraph.
Certificate Holder Representative: (Name & Signature)
Position: Date(Y/M/D):
CIVIL AVIATION
ADMINISTRATION
OF CHINA CCAR-121 / 135 OPERATIONS SPECIFICATIONS
CAAC DOCUMENT
APPROVAL NO
AC-121-001R1
(Company Name) B0049-1 Certificate No:
Effective Date: Y M D
B0049 CANADIAN MNPS AIRSPACE
a. The certificate holder is authorized to conduct operations in Canadian Minimum Navigation
Performance Airspace (MNPS) as defined in the Canadian Aeronautical Information Publication
(AIP) and in accordance with the limitations and provisions of this management specification.
b. This authorization does not constitute Precondition authorization for operations in the North
Atlantic (NAT) MNPS (Operations Specifications B0021).
c. The certificate holder is authorized to use the following approved aircraft and equipment in
Canadian unique MNPS airspace operations:
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:
CCAR121_135 Operations Specifications(47)