• 热门标签
时间:2010-06-06 22:22来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

the effective date.
CIVIL AVIATION
ADMINISTRATION
OF CHINA CCAR-121 / 135 OPERATIONS SPECIFICATIONS
CAAC DOCUMENT
APPROVAL NO
AC-121-001R1
(Company Name) A0097-2 Certificate No:
Effective Date: Y M D
1. Issued by (Branch Name) ,Regional Administration of CAAC
2. These Operations Specifications are approved by direction of CAAC
Principal Operations Inspector: (Name & Signature of POI)
3. Date Approval is effective (Y/M/D) Amendment Number:
4. The certificate holder hereby accepts and receives the Operations Specifications in this
paragraph.
Certificate Holder Representative: (Name & Signature)
Position: Date(Y/M/D):
CIVIL AVIATION
ADMINISTRATION
OF CHINA CCAR-121 / 135 OPERATIONS SPECIFICATIONS
CAAC DOCUMENT
APPROVAL NO
AC-121-001R1
(Company Name) A0099-1 Certificate No:
Effective Date: Y M D
A0099 WEIGHT AND BALANCE CONTROL PROCEDURES
The following procedures have been established to maintain control of weight and balance of the
certificate holder’s aircraft operated under the terms of these specifications (identified below) and to
ensure that these aircraft are loaded within the takeoff gross weight and center of gravity limitations.
a. Procedures by which either actual or approved average passenger and crew weights may be
used are in the operator's weight and balance control program.
b. Procedures by which either actual or approved average baggage weights may be used are in
the operator's weight and balance control program.
c. The actual passenger and baggage weights shall be used in computing the weight and
balance of charter flights and other special service involving the carriage of special groups.
d. All aircraft shall be weighed in accordance with the procedures for establishing individual or
fleet aircraft weights outlined in the operator's weight and balance control program.
e. The following loading schedules and instructions shall be used for routine operations:
AIRCRAFT
(M/M/S)
TYPE OF LOADING SCHEDULE
LOADING SCHEDULE
INSTRUCTIONS
WEIGHT AND BALANCE
CONTROL PROCEDURE
1. Issued by (Branch Name) ,Regional Administration of CAAC
2. These Operations Specifications are approved by direction of CAAC
Principal Operations Inspector: (Name & Signature of POI)
3. Date Approval is effective (Y/M/D) Amendment Number:
4. The certificate holder hereby accepts and receives the Operations Specifications in this
paragraph.
Certificate Holder Representative: (Name & Signature)
Position: Date(Y/M/D):
CIVIL AVIATION
ADMINISTRATION
OF CHINA CCAR-121 / 135 OPERATIONS SPECIFICATIONS
CAAC DOCUMENT
APPROVAL NO
AC-121-001R1
(Company Name) B0001-1 Certificate No:
Effective Date: Y M D
PART B: EN ROUTE AUTHORIZATIONS, LIMITATIONS AND PROCEDURES
B0001 DRIFTDOWN OR FUEL DUMPING
a. The system described or referenced in this paragraph is used by the certificate holder for its
approved driftdown or fuel dumping procedures, limitations, and data that are used to
demonstrate compliance with the CCAR terrain clearance requirements.
1. Issued by (Branch Name) ,Regional Administration of CAAC
2. These Operations Specifications are approved by direction of CAAC
Principal Operations Inspector: (Name & Signature of POI)
3. Date Approval is effective (Y/M/D) Amendment Number:
4. The certificate holder hereby accepts and receives the Operations Specifications in this
paragraph.
Certificate Holder Representative: (Name & Signature)
Position: Date(Y/M/D):
CIVIL AVIATION
ADMINISTRATION
OF CHINA CCAR-121 / 135 OPERATIONS SPECIFICATIONS
CAAC DOCUMENT
APPROVAL NO
AC-121-001R1
(Company Name) B0005-1 Certificate No:
Effective Date: Y M D
B0005 AREAS OF EN ROUTE OPERATION
The certificate holder is authorized to conduct the en route operations specified in this paragraph only
within the areas of en route operation listed in paragraph B0039 of these operations specifications.
The certificate holder shall comply with any limitations and procedures specified for each area listed
and the provisions of the paragraphs referenced for each area. The certificate holder shall not
conduct any other en route operation within any other area under these operations specifications.
a. The certificate holder is authorized to conduct en route operations in accordance with the
provisions of these operations specifications.
b. The certificate holder is authorized to conduct Class I navigation. When conducting IFR Class I
navigation, the certificate holder is authorized to conduct these operations in accordance with the
following additional provisions:
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:CCAR121_135 Operations Specifications(30)