• 热门标签
时间:2010-06-06 22:22来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

x 10E-4 (less than one hour in 1,887 flight hours).
(3) The proportion of the total flight time in NAT/MNPS airspace spent by airplane between 50
nautical miles (92.6 kilometers) and 70 nautical miles (129.64 kilometers) offtrack is less than
1.3 x 10E-4 (less than one hour in 7,693 flight hours)
(4) Suitable displays must be available at each pilot's station to permit continuous monitoring of
the long-range navigation systems crosstrack and alongtrack information.
c. The certificate holder is authorized to conduct operations in NAT/MNPS airspace where RVSM
approval is required provided that the certificate holder has been issued operations specifications
paragraph B0035, Operations in Reduced Vertical Separation Minimum (RVSM) Airspace, and
the certificate holder follows the limitations and provisions of operations specifications B0035
subparagraphs a, b, c, d, and e.
d. The certificate holder is authorized to operate within the entire NAT/MNPS airspace using the
airplanes and navigation equipment listed below.
AIRPLANE TYPE
(MAKE/MODEL/SERIES)
NAVIGATION EQUIPMENT
(MANUFACTURER/MODEL)
RESTRICTIONS AND
LIMITATIONS
CIVIL AVIATION
ADMINISTRATION
OF CHINA CCAR-121 / 135 OPERATIONS SPECIFICATIONS
CAAC DOCUMENT
APPROVAL NO
AC-121-001R1
(Company Name) B0021-2 Certificate No:
Effective Date: Y M D
e. The certificate holder is authorized to operate within NAT/MNPS airspace over the routes
published in the U.S. International Flight Information Manual as Special Contingency Routings
using the airplanes and navigation equipment listed below.
AIRPLANE TYPE
(MAKE/MODEL/SERIES)
NAVIGATION EQUIPMENT
(MANUFACTURER/MODEL)
RESTRICTIONS AND
LIMITATIONS
1. Issued by (Branch Name) ,Regional Administration of CAAC
2. These Operations Specifications are approved by direction of CAAC
Principal Operations Inspector: (Name & Signature of POI)
3. Date Approval is effective (Y/M/D) Amendment Number:
4. The certificate holder hereby accepts and receives the Operations Specifications in this
paragraph.
Certificate Holder Representative: (Name & Signature)
Position: Date(Y/M/D):
CIVIL AVIATION
ADMINISTRATION
OF CHINA CCAR-121 / 135 OPERATIONS SPECIFICATIONS
CAAC DOCUMENT
APPROVAL NO
AC-121-001R1
(Company Name) B0023-1 Air Operator
Certificate No:
Effective Date: Y M D
B0023 OPERATIONS IN AREAS OF MAGNETIC UNRELIABILITY
The certificate holder is authorized to conduct operations in the areas of magnetic unreliability within
the areas of en route operation where this paragraph is referenced in paragraph B0039 of these
operations specifications using the aircraft, navigation equipment, and procedures specified in
subparagraph a. below, provided the provisions of this paragraph are met. The certificate holder shall
not conduct any other operations in areas of magnetic unreliability under these operations
specifications.
a. The certificate holder shall not conduct operations in areas of magnetic unreliability unless the
required navigation equipment is installed and operational and the following procedures are used
for the aircraft listed below:
AIRCRAFT TYPE TYPE NAVIGATION
(MAKE/MODEL/SERIES)
NAVIGATION EQUIPMENT
(MANUFACTURER / MODEL) EN ROUTE APPROACH
b. Special Limitations and Provisions.
(1) The certificate holder shall not conduct operations in areas of magnetic unreliability, unless
the certificate holder's approved training program provides training in the equipment and
special procedures to be used.
(2) Except when navigation is performed under the supervision of a check airman properly
qualified for operations in areas of magnetic unreliability, any flight crewmember used in these
operations must be qualified in accordance with the certificate holder's approved training
program for the navigation system and procedures being used. Any flight crewmember
performing under the supervision of a check airman shall have satisfactorily completed the
ground school portion of that approved training program.
1. Issued by (Branch Name) ,Regional Administration of CAAC
2. These Operations Specifications are approved by direction of CAAC
Principal Operations Inspector: (Name & Signature of POI)
3. Date Approval is effective (Y/M/D) Amendment Number:
4. The certificate holder hereby accepts and receives the Operations Specifications in this
paragraph.
Certificate Holder Representative: (Name & Signature)
Position: Date(Y/M/D):
CIVIL AVIATION
ADMINISTRATION
OF CHINA CCAR-121 / 135 OPERATIONS SPECIFICATIONS
CAAC DOCUMENT
APPROVAL NO
AC-121-001R1
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:CCAR121_135 Operations Specifications(37)