• 热门标签
时间:2010-06-06 22:22来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

(3) The ICAO flight plan filed to the Air Traffic Service provider must show that the airplane and
operator are approved for the specified RNP (or better).
d. The administrator may authorize a certificate holder to deviate from RNP requirements in
subparagraph c for a specific individual flight in airspace where an RNP type is specified if the Air
Traffic Service provider determined that the airplane will not interfere with, or impose a burden on
other operators. Operations conducted under such authority will be conducted in accordance
with the following limitations and provisions:
(1) If fuel planning is predicated on en route climb to flight levels where RNP is normally required,
an appropriate request must be coordinated in advance of the flight with the Air Traffic Service
provider.
(2) The appropriate information blocks in the ICAO flight plan filed with the Air Traffic Service
provider must show that the airplane is not approved for the specified RNP type.
(3) At dispatch, at least one of the navigation system configurations listed in subparagraph b(6)
above must be installed and operational.
CIVIL AVIATION
ADMINISTRATION
OF CHINA CCAR-121 / 135 OPERATIONS SPECIFICATIONS
CAAC DOCUMENT
APPROVAL NO
AC-121-001R1
(Company Name) B0015-3 Certificate No:
Effective Date: Y M D
1. Issued by (Branch Name) ,Regional Administration of CAAC
2. These Operations Specifications are approved by direction of CAAC
Principal Operations Inspector: (Name & Signature of POI)
3. Date Approval is effective (Y/M/D) Amendment Number:
4. The certificate holder hereby accepts and receives the Operations Specifications in this
paragraph.
Certificate Holder Representative: (Name & Signature)
Position: Date(Y/M/D):
CIVIL AVIATION
ADMINISTRATION
OF CHINA CCAR-121 / 135 OPERATIONS SPECIFICATIONS
CAAC DOCUMENT
APPROVAL NO
AC-121-001R1
(Company Name) B0017-1 Certificate No:
Effective Date: Y M D
B0017 OPERATIONS IN CENTRAL EAST PACIFIC (CEP) AIRSPACE
The certificate holder is authorized to conduct operations in Central East Pacific (CEP) airspace
(between the State of Hawaii and the 48 contiguous states of United States) provided the provisions
of this paragraph are met. The certificate holder shall not conduct any other operations in this
airspace under these operations specifications.
a. For all flights in CEP airspace where RNP-10 and/or RVSM approval are not required either of
the following conditions must be met:
(1) The operation must be conducted in accordance with the provisions and limitations of B0015
subparagraph b, or
(2) The operation must be conducted using a flight navigator and the required navigation
equipment specified in paragraph B0037a(1),or B0037a(2).
b. The certificate holder is authorized to conduct operations in CEP airspace where RNP-10
approval is required provided that the certificate holder has been issued operations specification
paragraph B0015, Class II Navigation Using Multiple Long Range Navigation System (LRNS), is
authorized RNP-10 (or better), and the certificate holder follows the limitations and provisions of
operations specification B0015 subparagraphs b, c, and d.
c. The certificate holder is authorized to conduct operations in CEP airspace where RVSM approval
is required provided that the certificate holder has been issued operations specifications
paragraph B0035, Operations in Reduced Vertical Separation Minimum (RVSM) Airspace, and
the certificate holder follows the limitations and provisions of operations specification B0035
subparagraphs a, b, c, d, and e.
d. The administrator may authorize a certificate holder to deviate from the RNP-10 and/or RVSM
requirements in subparagraphs b and c above provided that the requirements of operations
specification B0015 subparagraphs b and d are met if the deviation relates to RNP-10 ;or the
requirements of B0035 subparagraph e are met, if the deviation is related to RVSM.
CIVIL AVIATION
ADMINISTRATION
OF CHINA CCAR-121 / 135 OPERATIONS SPECIFICATIONS
CAAC DOCUMENT
APPROVAL NO
AC-121-001R1
(Company Name) B0017-2 Certificate No:
Effective Date: Y M D
1. Issued by (Branch Name) ,Regional Administration of CAAC
2. These Operations Specifications are approved by direction of CAAC
Principal Operations Inspector: (Name & Signature of POI)
3. Date Approval is effective (Y/M/D) Amendment Number:
4. The certificate holder hereby accepts and receives the Operations Specifications in this
paragraph.
Certificate Holder Representative: (Name & Signature)
Position: Date(Y/M/D):
CIVIL AVIATION
ADMINISTRATION
OF CHINA CCAR-121 / 135 OPERATIONS SPECIFICATIONS
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:CCAR121_135 Operations Specifications(35)